Global Information Lookup Global Information

Mumbai Trans Harbour Link information


Mumbai Trans Harbour Link

Atal Setu
Coordinates18°58′52″N 72°55′01″E / 18.9811°N 72.9169°E / 18.9811; 72.9169
Carries6-lanes (3 lanes in each direction)
CrossesThane Creek
LocaleMumbai Metropolitan Region, Maharashtra, India
BeginsSewri, South Mumbai
EndsChirle, Uran taluka, Navi Mumbai
Official nameAtal Bihari Vajpayee Sewri–Nhava Sheva Atal Setu
Other name(s)Mumbai Trans Harbour Link
Named forAtal Bihari Vajpayee
OwnerMumbai Metropolitan Region Development Authority (MMRDA)
Websitemmrda.maharashtra.gov.in/projects/transport/mumbai-trans-harbour-link/overview
Characteristics
DesignConcrete-steel pre-cast segment viaduct
Total length21.8 kilometres (13.5 mi)
(bridge: 18,187 metres (59,669 ft)[1])
Width27 metres (89 ft)
Height25 metres (82 ft)
Water depth47 metres (154 ft)[2]
Traversable?Yes
Longest span180 metres (590 ft)[3]
Piers in water1,089[2]
Design life100+ years
History
Engineering design byAECOM, PADECO, Dar Al-Handasah and T. Y. Lin International
Constructed by
  • Larsen & Toubro
  • IHI Corporation
  • Daewoo E&C
  • Tata Projects EFKON Strabag
Construction start24 April 2018[4]
Construction endDecember 2023[5]
Construction cost17,843 crore (US$2.2 billion)[6]
Opened12 January 2024; 3 months ago (12 January 2024)[7]
Statistics
TollCar: ₹ 200 (single)
₹ 300 (return)
Bus: ₹ 320 (single)
₹ 480 (return)
LCV: ₹ 655 (single)
₹ 985 (return)
Truck: ₹ 715 (single)
₹ 1075 (return)
Heavy-duty truck: ₹ 1030 (single)
₹ 1545 (return)
Oversized truck: ₹ 1255 (single)
₹ 1885 (return)[8]
Location
Map

The Mumbai Trans Harbour Link, officially named as Atal Bihari Vajpayee Sewri–Nhava Sheva Atal Setu and colloquially known as Atal Setu, is a 21.8 km (13.5 mi) 6-lane elevated highway bridge, which connects Mumbai with Navi Mumbai, its satellite city. It is the longest sea bridge in India, and the world's 12th longest sea bridge.[9][10] The bridge begins in Sewri, South Mumbai, crosses Thane Creek north of Elephanta Island, and terminates at Chirle near Nhava Sheva in Uran taluka, Navi Mumbai. The road is linked to the Mumbai–Pune Expressway in the east and to the Coastal Road in the west. The 6-lane highway is 27 meters in width, in addition to two emergency exit lanes,[11] two edge strips, parallel crash barriers and noise barriers on both sides.[12][13][14] The project costs a total of 17,843 crore (US$2.2 billion).[6] The bridge has a capacity to handle 70,000 vehicles per day.[15] Construction on the bridge began in April 2018, and was inaugurated by Prime Minister Narendra Modi on 12 January 2024.[16]

  1. ^ https://themetrorailguy.com/mmrda-mumbai-trans-harbour-link-information-route-map-status/
  2. ^ a b Ozarkar, Vallabh (11 October 2021). "Mumbai: Bridging the bay". The Indian Express. Retrieved 25 November 2021.
  3. ^ Nair, Aishwarya (16 May 2018). "Longest steel span for MTHL". The Asian Age. Retrieved 27 April 2019.
  4. ^ "Mumbai Trans Harbour Link Project Complete Details, Route Map, Contrators, Package Information". India Construction Info. 21 December 2022. Retrieved 5 January 2024.
  5. ^ "Navi Mumbai's infra marvel! India's longest sea bridge project Mumbai Trans Harbour Link nears Jan 2024 deadline – Details inside". The Financial Express. 25 December 2023. Retrieved 5 January 2024.
  6. ^ a b "Mumbai Trans Harbour Link – Information & Status". The Metro Rail Guy. Retrieved 5 January 2024.
  7. ^ "Mumbai Trans Harbour Link Inauguration Live Updates: PM Modi inaugurates Atal Setu bridge". The Times of India. 12 January 2024. Retrieved 12 January 2024.
  8. ^ Vijay, Amit (29 January 2024). "MTHL sees 3 lakh users after toll drops to Rs 200 for Sewri-Ulwe leg". Autocar India. Retrieved 30 January 2024.
  9. ^ "Mumbai To Navi Mumbai In 20 Minutes As India's Longest Sea Bridge Opens". NDTV. 12 January 2024. Retrieved 12 January 2024.
  10. ^ "World's 12th Longest Sea Bridge In India". Rediff News. 8 January 2024. Retrieved 12 January 2024.
  11. ^ "Mumbai Trans Harbour Link expected to be built by 2021; Will it make your travel easier?". Moneycontrol. 21 November 2017. Retrieved 26 November 2017.
  12. ^ "The Pioneer". India. Retrieved 21 July 2013.
  13. ^ [1] Archived 29 February 2012 at the Wayback Machine
  14. ^ "Trans Harbour Link switches tracks to Metro". The Indian Express. 20 January 2011. Retrieved 21 July 2013.
  15. ^ "Mumbai may have to pay toll for 23 years to cruise on MTHL". dna. 4 February 2018. Retrieved 15 October 2018.
  16. ^ "PM Modi inaugurates India's longest sea bridge Atal Setu in Maharashtra". Firstpost. 12 January 2024. Retrieved 12 January 2024.

and 18 Related for: Mumbai Trans Harbour Link information

Request time (Page generated in 1.0213 seconds.)

Mumbai Trans Harbour Link

Last Update:

The Mumbai Trans Harbour Link, officially named as Atal Bihari Vajpayee Sewri–Nhava Sheva Atal Setu and colloquially known as Atal Setu, is a 21.8 km...

Word Count : 12163

Navi Mumbai

Last Update:

starts at Kalamboli in Navi Mumbai. The Mumbai Trans Harbour Link (MTHL), also known as the Sewri-Nhava Sheva Trans Harbour Link, is a 22-kilometre (14 mi)...

Word Count : 3973

Ulwe

Last Update:

the Mumbai Trans Harbour Link and the new NMIA (Navi Mumbai International Airport), and another arm of the coastal road will connect the sea link to JNPT...

Word Count : 752

2024 in India

Last Update:

Minister Modi dedicates Mumbai Trans Harbour Link (Atal Setu) the longest bridge in India that connects Mumbai with Navi Mumbai. 14 January - Bharat Jodo...

Word Count : 3551

Bogibeel Bridge

Last Update:

India after the Mumbai Trans Harbour Link, Bhupen Hazarika Setu, Dibang River Bridge, Mahatma Gandhi Setu and Bandra–Worli Sea Link. The bridge was constructed...

Word Count : 1593

Transport in Mumbai

Last Update:

transportation bridge in Mumbai. The Trans Harbour Sea-link Bridge, also known as Shri Atal Bihari Vajpayee Trans-Harbour Link (Atal Setu) is the longest...

Word Count : 2709

Chirle

Last Update:

district, Maharastra. The under-construction Mumbai Trans Harbour Link will connect Chirle with Sewri, South Mumbai. The proposed Konkan Expressway will connect...

Word Count : 140

Atal Setu

Last Update:

Jammu and Kashmir Atal Setu, Sikkim Mumbai Trans Harbour Link, officially Shri Atal Bihari Vajpayee Trans Harbour Link or Atal Setu Atal Pedestrian Bridge...

Word Count : 86

List of expressways in Maharashtra

Last Update:

Status". Magicbricks Blog. 2022-02-24. Retrieved 2022-07-12. "Mumbai-Pune Expressway's Missing Link – Information & Status Update". The Metro Rail Guy. The...

Word Count : 440

Navi Mumbai International Airport

Last Update:

Nehru Port Mumbai Trans Harbour Link Vikhroli-Koparkhairane Link Road Jogeshwari–Vikhroli Link Road Sion Panvel Expressway Bandra–Worli Sea Link List of...

Word Count : 2731

Timeline of Mumbai

Last Update:

mumbai-trans-harbour-link-mthl-today-11705023137497.html Wikimedia Commons has media related to History of Mumbai. Timeline of Mumbai Blasts hit...

Word Count : 1290

List of bridges in India

Last Update:

steel deck on Mumbai-Trans Harbour Link". Infra.economictimes.indiatimes.com. Retrieved December 20, 2022. "Mumbai Trans Harbour Link (MTHL) Project"...

Word Count : 4619

Jawaharlal Nehru Port

Last Update:

Uran City and Industrial Development Corporation Mumbai Port Trust Mumbai Trans Harbour Link Navi Mumbai "Geographic Location". Jawaharlal Nehru Port Trust...

Word Count : 914

Mumbai Suburban Railway

Last Update:

the Central Line, Harbour Line, Trans-Harbour Line, Vasai–Roha Line and Neral–Matheran & Panvel–Karjat line. The Central Line in Mumbai consists of three...

Word Count : 6811

Mumbai

Last Update:

(14 mi) long Mumbai Trans Harbour Link was inaugurated by Prime Minister Narendra Modi on 12 January 2024, connects Mumbai with Navi Mumbai. Mumbai has approximately...

Word Count : 22647

List of longest bridges

Last Update:

Hotan-Ruoqiang Railway Underway in China's Xinjiang". 2020-12-02. "Mumbai Trans Harbour Link – Information & Status". "PM Modi inaugurates India's longest...

Word Count : 2307

Mumbai Metro

Last Update:

project will only begun after the construction of the proposed Mumbai Trans Harbour Link commences. In a report on 14 November 2014 about the cancellation...

Word Count : 5737

History of Mumbai during the 21st century

Last Update:

killed, and 130 injured. 26 March - 2021 Mumbai hospital fire 18 July - 2021 Mumbai landslide The Trans Harbour bridge is the longest bridge in India and...

Word Count : 1222

PDF Search Engine © AllGlobal.net