The Minto Flywheel Facility for grid frequency regulation was the first in Canada.[1]
The 2 MW (for 15 min)[2] flywheel storage facility in Minto Ontario, Canada opened in 2014.[1]
The flywheel system (developed by NRStor and built by Temporal Power) uses 10 spinning steel flywheels on magnetic bearings.[1]
^ abcWillis, Ben (2014-07-23). "Canada's first grid storage system launches in Ontario". PV-Tech Storage. Archived from the original on 2015-11-22.
^"IESO Expedited System Impact Assessment - Minto Flywheel Facility" (PDF). Independent Electricity System Operator. 2013. Archived from the original (PDF) on 2016-01-29.
and 2 Related for: Minto Flywheel Facility information
The MintoFlywheelFacility for grid frequency regulation was the first in Canada. The 2 MW (for 15 min) flywheel storage facility in Minto Ontario, Canada...
min) flywheel storage facility in Minto, Ontario, Canada opened in 2014. The flywheel system (developed by NRStor) uses 10 spinning steel flywheels on magnetic...