Metrorrey Line 4 is an under-construction Metrorrey line that will municipalities of Monterrey and San Pedro Garza García. It will have an extension of approximately 7.5 kilometers. It will connect with lines 3, 5 and 6 at the Saint Lucia station (in front of the High Specialty Medical Unit No. 23 of the Mexican Social Security Institute).
On 29 April 2022, the Government of the State of Nuevo León launched an international public tender for the construction of the line. Construction work is expected to begin on 31 August 2022 and end on 31 August 2027. The second phase of the construction of 13.5 kilometres of lines 4 and 6 was expected to be completed on 30 November 2024,[2][3] though as of May 2024, Governor Samuel García expects lines 4 and 6 to be ready by the time the 2026 FIFA World Cup happens in June 2026.[1]
^ abSolheim Rocha, Erik (29 May 2024). "Nuevas líneas del Metro llevan un 30 por ciento de avance, señala Samuel García". Milenio. Retrieved 2 June 2024.
^Charles, Ángel (29 April 2022). "Ajustan 3 líneas y lanzan licitación". El Norte (in Spanish). Retrieved 1 May 2022.
^Chio, Yolanda (29 April 2022). "Publican licitación para Líneas 4, 5 y 6 del Metro". info7 (in Spanish). Retrieved 1 May 2022.
MetrorreyLine4 is an under-construction Metrorreyline that will municipalities of Monterrey and San Pedro Garza García. It will have an extension of...
Metrorrey, officially Sistema de Transporte Colectivo Metrorrey, is a rapid transit system that serves the metropolitan area of Monterrey. It is operated...
MetrorreyLine 6 is one of the three lines currently planned by Metrorrey, which will connect the municipalities of Monterrey, Guadalupe, San Nicolás...
MetrorreyLine 5 is one of the three Metrorrey lines currently under construction of that will connect the south of Monterrey with the center of Monterrey...
Line 2 is a line on the Metrorrey system. It has 13 stations and it runs 13.036 km (8.100 mi) from Sendero to Zaragoza. The line opened on 30 November...
Line 3 is a line on the Metrorrey system. It has 8 stations and is 7.5 km (4.7 mi) long. The line opened on February 27, 2021. Construction for line 3...
Line 1 is a line on the Metrorrey system. It has 19 stations and it runs 18.828 km (11.699 mi) from Talleres to Exposición. The line opened on April 25...
Monterrey Metro system (also referred to as Metrorrey) of Monterrey, Nuevo León, Mexico, organized by line. "Red Metro" [Metro Network (map)] (in Spanish)...
problems gripping the U.K. Overseas Territory of the Cayman Islands. Metrorrey Lines 4, 5 and 6, Monterrey metropolitan area, Nuevo Leon. In August 2022...
construction and is under testing. Mexico. MetrorreyLine 5 in Monterrey. This new line of the Metrorrey system is currently being built by the government...
Colectivo – Metrorrey – Historia" [System of Collective Transport – Metrorrey – History] (in Spanish). Sistema de Transporte Colectivo Metrorrey. Retrieved...
Monterrey metro stations Schwandl, Robert. "Monterrey". urbanrail. "STC Metrorrey - Gobierno del Estado de Nuevo León, México: HISTORIA" (in Spanish). Retrieved...
(partial) DART Green Line (north branch) Metrorrey (partial) Bangalore metro Chennai Metro Chennai Mass Rapid Transit System Daegu Metro (Line 3) Danhai Light...
includes: Ferrocarril Suburbano de la Zona Metropolitana de México STC Metrorrey Servicio de Transportes Eléctricos Metro de la Ciudad de México Sistema...
March 2019. "Sistema de Transporte Colectivo › Metrorrey › Historia" [Collective Transit System › Metrorrey › History] (in Mexican Spanish). Gobierno del...
project. – São Paulo Metro Line 17 expected to start operation. – Metrorrey Lines 4 and 6 are expected to be opened on or before this time. – Planned...
terminals and three intermodal stations. It would connect with the Ecovía and Metrorrey Lines 1 and 2. According to the Secretariat of Communications and Transport...
modern look with dark wall colors and stylish light fixtures including the Metrorrey logo, Monterrey’s famous hill Cerro de la Silla, and a lion representing...
bus line operated by the Nuevo Leon State Government called the Ruta Express (Express Route) also operates from the airport to the MetrorreyLine 1's...
CRRC Nanjing Puzhen began to produce DRT vehicles for lines 4, 5 and 6 of the Metrorrey system in Monterrey, Mexico. The vehicles were unveiled on 29...
Colectivo – Metrorrey – Historia" [System of Collective Transport – Metrorrey – History] (in Spanish). Sistema de Transporte Colectivo Metrorrey. Retrieved...
neighborhood (Colonia Acero) and it is close to Parque Fundidora. "STC Metrorrey - Gobierno del Estado de Nuevo León, México: HISTORIA" (in Spanish). Retrieved...