Global Information Lookup Global Information

Madawaska HVDC information


The Madawaska HVDC link between the Canadian provinces of Quebec and New Brunswick[1] is located in Quebec near the village of Degelis at 47°30′31″N 68°31′25″W / 47.50861°N 68.52361°W / 47.50861; -68.52361 (Madawaska HVDC back-to-back station) with a connection into New Brunswick near the city of Edmundston. This 350 MW thyristor valve back-to-back HVDC station (with a winter overload rating of 435 MW) was completed in 1985 and connects the 315 kV Quebec transmission system with the 345 kV system in New Brunswick.

Madawaska was built by General Electric and is based on their earlier design of the world's first fully thyristor valve link, the 320 MW Eel River back-to-back HVDC station near Dalhousie, NB. However, instead of using synchronous condensers for voltage control and reactive power supply to the thyristors, Madawaska uses switched filter and shunt reactor banks connected to the high voltage busses on each side. In 2017, Madawaska was upgraded.[1]

  1. ^ a b Capkun, Anthony (17 January 2017). "ABB completes Madawaska HVDC link upgrade". Electrical Business. Retrieved 26 February 2024.

and 3 Related for: Madawaska HVDC information

Request time (Page generated in 0.7539 seconds.)

Madawaska HVDC

Last Update:

The Madawaska HVDC link between the Canadian provinces of Quebec and New Brunswick is located in Quebec near the village of Degelis at 47°30′31″N 68°31′25″W...

Word Count : 185

List of HVDC projects

Last Update:

(ALEGrO) Viking Link HVDC DolWin1, HVDC DolWin2, HVDC DolWin3 HVDC SylWin1 HVDC HelWin1, HVDC HelWin2 HVDC BorWin1, HVDC BorWin2, HVDC BorWin3 NorNed: Feda...

Word Count : 5258

NB Power

Last Update:

transfer capacity. It is the first operative HVDC system equipped with thyristors The second converter, the Madawaska substation (435 MW), was built on the Quebec...

Word Count : 3837

PDF Search Engine © AllGlobal.net