Karadeniz Powership Onur Sultan
| |
History | |
---|---|
Liberia | |
Name |
|
Owner | Karpowership |
Operator | Karpowership |
Builder | JMU TSU Shipyard in Tsu, Mie, Japan |
Yard number | 211 |
Laid down | 12 February 2001 |
Launched | 17 April 2001 |
Completed | 26 July 2001 |
Identification |
|
General characteristics | |
Class and type |
|
Tonnage |
|
Length | 289 m (948 ft 2 in) (LOA) |
Beam | 45 m (147 ft 8 in) |
Draught | 5.90 m (19.4 ft) |
Speed | 9.1 knots (16.9 km/h; 10.5 mph) (max), 7.1 knots (13.1 km/h; 8.2 mph) (avg) |
Capacity | 470 MW (as powership) |
The MV Karadeniz Powership Onur Sultan is a Liberia-flagged floating power plant, owned and operated by Karpowership. In 2016, she was sent off from the Sedef Shipyard in Tuzla, Istanbul, Turkey to Myanmar to supply electricity to the power grid.[2] In 2018, she was commissioned to supply electricity to the power grid in Indonesia.
mt