Global Information Lookup Global Information

MRTJ 1000 series information


MRT Jakarta Series K1 1 18
MRT Jakarta 1000 series Ratangga
Set 03 with Jak Lingko logo.
Interior of the set
In service2019–present
ManufacturerNippon Sharyo
Order no.CP 108
Built atToyokawa, Aichi, Japan
Constructed2018
Entered service24 March 2019
Number built96 vehicles (16 sets)
Number in service96 vehicles (16 sets)
Formation6-car sets
Tc1-M2'-M1'-M2-M1-Tc2
Fleet numbers01–16
OperatorsMRT Jakarta
DepotsLebak Bulus
Lines servedNorth–South Line
Specifications
Car body constructionStainless steel
Train length118.15 m (387 ft 8 in)
Car length
  • 20,075 mm (65 ft 10.4 in) (Tc)
  • 19.5 m (64 ft 0 in) (M)
Width2.95 m (9 ft 8 in)
Height
  • 3,655 mm (11 ft 11.9 in) (roof)
  • 3,985 mm (13 ft 0.9 in) (top of AC)
  • 3,995 mm (13 ft 1.3 in) (top of folded pantograph)
Floor height1.15 m (3 ft 9 in)
Doors4 per side
Wheel diameter860–820 mm (34–32 in) (new–worn)
Wheelbase2,100 mm (6 ft 11 in)
Maximum speed100 km/h (62 mph)
Traction systemToyo Denki RG6036-A-M IGBT–VVVF[1]
Traction motors16 × Toyo Denki TDK6326-A 126 kW (169 hp) asynchronous 3-phase AC
Power output2,016 kW (2,704 hp)
TransmissionTwin-Disc (TD) Drive; gear ratio: 6.53 : 1 (98 / 15)[1]
Acceleration0.92 m/s2 (3.0 ft/s2)
Deceleration
  • 0.8 m/s2 (2.6 ft/s2) (service)
  • 1 m/s2 (3.3 ft/s2) (emergency)
Electric system(s)1,500 V DC (nominal) from overhead catenary
Current collector(s)Pantograph
UIC classification2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′
BogiesND-748 (powered), ND-748T (trailer)
Safety system(s)Nippon Signal SPARCS moving block CBTC with subsystems of ATC, ATO under GoA 2 (STO), ATP, ATS, CBI
Coupling systemShibata close-contact
SeatingLongitudinal
Track gauge1,067 mm (3 ft 6 in)
Notes/references
Sourced from [2] except where noted

The MRT Jakarta 1000 series, known legally as the Series K1 1 18,[a] are the first generation rolling stocks to operate in the MRT Jakarta system. The train set is also known as the Ratangga.[3][4] The train set was manufactured by Japanese company Nippon Sharyo under Contract CP108, all sets were built in 2018 and started operation on 24 March 2019. It is classified as an executive class train operated with a formation of six trains in each set.[5][6]

  1. ^ a b "Electrical equipment of Jakarta Mass Rapid Transit (MRTJ)" (PDF) (in Japanese and English). Toyo Denki. 2019. Archived from the original (PDF) on 3 April 2023. Retrieved 11 February 2023.
  2. ^ "ジャカルタ都市高速鉄道南北線向け電車" (in Japanese). Nippon Sharyo. Retrieved 11 February 2023.
  3. ^ "MRT Diberi Nama Ratangga, Diambil dari Kitab Mpu Tantular". CNN Indonesia. 10 December 2018. Retrieved 2021-01-10.
  4. ^ Nailufar, Nibras Nada (10 December 2018). Aziza, Kurnia Sari (ed.). "Ratangga, Nama Baru Kereta MRT Jakarta..." Kompas.com. Retrieved 2021-01-10.
  5. ^ Sari, Nursita; Aziza, Kumia Sari (2019-03-23). "Pagi Ini, Presiden Jokowi Resmikan MRT Jakarta Halaman all". KOMPAS.com (in Indonesian). Retrieved 2024-01-26.
  6. ^ Tim. "Jokowi Resmikan MRT di Bundaran HI". nasional (in Indonesian). Retrieved 2024-01-26.


Cite error: There are <ref group=lower-alpha> tags or {{efn}} templates on this page, but the references will not show without a {{reflist|group=lower-alpha}} template or {{notelist}} template (see the help page).

and 7 Related for: MRTJ 1000 series information

Request time (Page generated in 0.7988 seconds.)

MRTJ 1000 series

Last Update:

The MRT Jakarta 1000 series, known legally as the Series K1 1 18, are the first generation rolling stocks to operate in the MRT Jakarta system. The train...

Word Count : 1311

Jakarta MRT

Last Update:

(Perseroda) Character Elevated & underground Number of vehicles 16 six-car MRTJ 1000 series trainsets Headway 5 minutes (peak) 10 minutes (off-peak) Technical...

Word Count : 5709

PNR EM10000 class

Last Update:

Sustina family, from which the sides of the EM10000 trains is derived. MRTJ 1000 series – Indonesian narrow-gauge variant of the STRASYA for the Jakarta MRT...

Word Count : 2534

Nippon Sharyo

Last Update:

Voith turbo (T211re.3) transmission. The new rolling stock, known as the MRTJ 1000, was built specifically for the Jakarta MRT State Railway of Thailand...

Word Count : 919

Blok A MRT station

Last Update:

rest of Phase 1 of the Jakarta MRT on 24 March 2019 (2019-03-24). MRTJ 1000 series Ratangga approaching Blok A MRT Station Ratangga in Blok A MRT Station...

Word Count : 164

Cipete Raya MRT station

Last Update:

rest of Phase 1 of the Jakarta MRT on 24 March 2019 (2019-03-24). The MRTJ 1000 series Ratangga approaching Cipete Raya MRT Station The signage of the station...

Word Count : 142

Haji Nawi MRT station

Last Update:

M04 Haji Nawi Jakarta MRT station MRTJ 1000 series Ratangga arriving at Haji Nawi Station General information Location Jalan RS Fatmawati 33, Gandaria...

Word Count : 175

PDF Search Engine © AllGlobal.net