Under construction light rail line in Toronto, Ontario
Line 5 Eglinton
Mount Dennis station under construction in 2023
Overview
Status
Under construction
Owner
Metrolinx
Locale
Toronto, Ontario, Canada
Termini
Mount Dennis (phase 1, western)
Renforth (phase 2, western)
Kennedy (eastern)
Stations
32
Service
Type
Light rail
System
Toronto subway
Operator(s)
Toronto Transit Commission[1]
Depot(s)
Eglinton Maintenance and Storage Facility
Rolling stock
Flexity Freedom
History
Planned opening
2024; 0 years ago (2024) (previous target; central)[2][3]
2030/2031; 7 years' time (2031) (west)[4]
Technical
Line length
28 km (17 mi)
Track gauge
1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification
Overhead line, 750 V DC[5]
Operating speed
In tunnel: 80 km/h (50 mph)
On surface: 60 km/h (37 mph)[6]
Signalling
Bombardier Cityflo 650 CBTC[7]
Route map
Legend
To Pearson Airport (proposed)
Mississauga Transitway
Renforth
Highway 427
Mimico Creek
Martin Grove
Kipling
Islington
Royal York
Scarlett
Humber River
Jane
Phase 2
Phase 1
Mount Dennis
Eglinton MSF
Black Creek Drive
Black Creek
Keelesdale
Caledonia
Fairbank
Oakwood
Cedarvale (Eglinton West)
Forest Hill
Chaplin
Avenue
Eglinton
Mount Pleasant
Leaside
Laird
West Don River
Sunnybrook Park
Canadian Pacific Kansas City
Science Centre
Aga Khan Park & Museum
Don Valley Parkway
Wynford
East Don River
Richmond Hill line
Sloane
O'Connor
Pharmacy
Hakimi Lebovic
Golden Mile
Birchmount
Ionview
Line 2 to Kipling
Kennedy (GO)
Line 2 to McCowan/Sheppard (future)
Eglinton East LRT (proposed)
This diagram:
view
talk
edit
Line 5 Eglinton (also known as the Eglinton Crosstown or the Crosstown) is a light rail line that is under construction in Toronto, Ontario, Canada. Owned by Metrolinx and operated by the Toronto Transit Commission (TTC), the line will be part of the Toronto subway system as its fifth route. The first phase of the 19-kilometre (12 mi) line will include 25 stops along Eglinton Avenue, from Mount Dennis station mostly underground to Laird station, after which it will run predominantly at-grade within the street's median to Kennedy station, where it will connect underground with Line 2 Bloor–Danforth. The second phase, a 9.2-kilometre (5.7 mi) westward extension from Mount Dennis, will run mostly underground or elevated to Renforth station, with seven new stations.
This first phase is scheduled to open in 2024, with an estimated cost of CA$12.82billion;[8] the cost when the contract was awarded was pegged at $9.1billion, although the cost was originally estimated at $11billion.[9] The second phase is expected to cost $4.7billion and to be completed by 2031.
The line was conceived in 2007 during the administration of Toronto mayor David Miller as part of Transit City, a large-scale transit expansion plan. Construction of the first phase of the line began in 2011 and was originally expected to be completed in 2020,[10] but the opening date has been revised more than once.[11] Metrolinx expected the line to be substantially complete by September 2022 but then conceded it would not meet that date. After revising the opening date of the central section to 2023 and then 2024, and amid ongoing legal action with Crosslinx (the construction consortium), Metrolinx stated they believed there was no credible schedule to complete the project.[12][13][14][15] While the central section is estimated to be 97 percent complete, Metrolinx will not provide an estimated completion date until three months before opening.[16][17] For budget purposes, the TTC made the assumption that Line 5 would open no earlier than September 2024.[2]
Construction of the westward extension to Renforth station began in July 2021.[18][19][4] An eastern extension to the University of Toronto Scarborough[20] and a northwestern extension towards Toronto Pearson International Airport were approved by Toronto City Council in 2016[21] but the eastern extension was split into its own line in 2022.
^Consiglio, Alex (October 3, 2012). "TTC to operate city's new LRT lines". Toronto Star. Archived from the original on November 3, 2012. Retrieved November 1, 2012.
^ abCite error: The named reference TheStar-2023-12-15 was invoked but never defined (see the help page).
^Wilson, Codi (December 15, 2023). "TTC planning for possible opening of Eglinton Crosstown LRT in September 2024". CP24.
^ ab"Eglinton Crosstown West Extension - FAQs". Metrolinx. Retrieved December 7, 2023.
^"Eglinton LRT 2012 update" (PDF). Metrolinx. February 2012. Archived from the original (PDF) on February 13, 2013. Retrieved November 1, 2013.
^Cite error: The named reference Metrolinx-2022/05/06 was invoked but never defined (see the help page).
^Cite error: The named reference BBD-2015-10-08 was invoked but never defined (see the help page).
^Cite error: The named reference TheStar-2022-12-08 was invoked but never defined (see the help page).
^Cite error: The named reference TheStar-2015-11-03 was invoked but never defined (see the help page).
^Cite error: The named reference CBC-2022-09-23 was invoked but never defined (see the help page).
^"FAQs". Eglinton Crosstown: The Project. Metrolinx. Archived from the original on February 20, 2017. Retrieved February 12, 2017. Q: What is the timeline for the project? A:The project will be complete in 2021
^Spurr, Ben (November 24, 2021). "Metrolinx agrees to new date to complete Crosstown LRT, says credit rating agency". Toronto Star. Archived from the original on November 25, 2021. Retrieved November 25, 2021.
^Cite error: The named reference TheStar-2021/12/22 was invoked but never defined (see the help page).
^Cite error: The named reference TheStar-2022-09-22 was invoked but never defined (see the help page).
^Cite error: The named reference CityNews-2023-05-16 was invoked but never defined (see the help page).
^"Metrolinx refuses to say when long-delayed Eglinton Crosstown LRT might open". Toronto Star. September 27, 2023.
^Cite error: The named reference TheStar-2023-12-08 was invoked but never defined (see the help page).
^"Next steps announced for Eglinton Crosstown West subway extension into Etobicoke, Mississauga". Global News. Archived from the original on August 19, 2020. Retrieved September 7, 2020.
^"Tunnelling starts on the Eglinton Crosstown West Extension". Metrolinx. April 11, 2022. Archived from the original on April 12, 2022.
^"Eglinton-Scarborough Crosstown Update" (PDF). Metrolinx. June 23, 2011. Archived from the original (PDF) on November 5, 2013. Retrieved July 28, 2011.
^"Agenda Item History". app.toronto.ca. Archived from the original on March 17, 2016. Retrieved September 7, 2020.
Line5Eglinton (also known as the Eglinton Crosstown or the Crosstown) is a light rail line that is under construction in Toronto, Ontario, Canada. Owned...
Eglinton East LRT (EELRT), also known as Line 7 Eglinton East: 24 and formerly known as the Scarborough Malvern LRT, is a proposed light rail line in...
Midtown Toronto. Eglinton station is the seventh busiest station of the Toronto Transit Commission (TTC). Line5Eglinton will serve Eglinton station upon...
side of Eglinton Avenue West. Line5Eglinton will also serve Eglinton West station upon its completion, scheduled for 2024. At that time, Eglinton West...
connect with Line5Eglinton. Its southern terminus will be at the existing Exhibition GO Station on the Lakeshore West line. The Ontario Line was announced...
The Eglinton West line was a proposed east–west subway line in Toronto, Ontario, Canada, whose construction began in 1994 but was cancelled in 1995. It...
the future Line5Eglinton, which will terminate at the station when its first phase opens in 2024. The station is located south of Eglinton Avenue, east...
station via Highway 427. An extension of Line5Eglinton, a light rail transit line under construction along Eglinton Avenue in Toronto, is slated to reach...
Little Jamaica, also known as Eglinton West, is an ethnic enclave in Toronto, Ontario, Canada. It is located along Eglinton Avenue West, from Marlee Ave...
rail lines and one subway line, with two extensions being added over the next decade. Line5Eglinton (also known as the Eglinton Crosstown LRT) is an under-construction...
Eglinton Avenue is a major east–west arterial thoroughfare in Toronto and Mississauga in the Canadian province of Ontario. The street begins at Highway...
district Eglinton Avenue, a main thoroughfare in Toronto Eglinton Park Eglinton Theatre Line5Eglinton or Eglinton Crosstown Line, a light rail line under...
companies to construct both this line and the Eglinton Crosstown line. The Eglinton Crosstown line was later renamed Line5Eglinton and officially given the...
light metro line: Line5Eglinton, a 25-station, 19-kilometre (12 mi) line along Eglinton Avenue, scheduled to open in 2024. A 9.2-kilometre (5.7 mi) extension...
line (Kyiv Metro), Ukraine (rejected) Vyshhorodsko–Darnytska line, Kyiv, Ukraine (proposed) Line5Eglinton, Toronto (under construction) Blue Line (Montreal...
council voted to restore the project, along with the Eglinton Crosstown LRT (later renamed Line5Eglinton), as part of a new transit plan, restoring some...
The Eglinton Maintenance and Storage Facility is a rail yard and vehicle service centre for Line5Eglinton of the Toronto subway. The facility is located...
the western terminus of the future Line5Eglinton as well as an intermediate station on the GO Transit Kitchener line and Union Pearson Express. The station...
Harris cancelled the Eglinton subway in York (though it would be later revived as Line5Eglinton, albeit as a light rail line with a long underground...
commercial space. The plan is to bring Line5Eglinton, Line 6 Finch West, the Mississauga Transitway, the Kitchener line and the Union Pearson Express together...
Kitchener and Waterloo, Ontario, and the Valley Line in Edmonton. It is planned for use on the Line5Eglinton light rail system under construction in Toronto...
project as the Eglinton East LRT. Until 2021, the city considered making the EELRT an eastward extension of Line5Eglinton (a.k.a. the Eglinton Crosstown...
under construction on Line5Eglinton, a new line that is part of the Toronto subway system. It will be located along Eglinton Avenue between the GO Transit...
transit (LRT) station and mobility hub under construction on Line5Eglinton, a new line that is part of the Toronto subway system. It will be located...
construction on Line5Eglinton began. Line5 is scheduled to finish construction by 2024. In 2015, the Ontario government promised to fund Line 6 Finch West...