Global Information Lookup Global Information

Kim Chuan Depot information


Kim Chuan Depot
Location
Location11 Kim Chuan Road, Singapore 537065
Coordinates1°20′27.97″N 103°53′14.15″E / 1.3411028°N 103.8872639°E / 1.3411028; 103.8872639
Characteristics
OwnerLand Transport Authority
OperatorSMRT Trains Ltd (SMRT Corporation)
TypeUnderground
RoadsKim Chuan Road, Upper Paya Lebar Road
Rolling stockAlstom Metropolis C830
Alstom Metropolis C830C
Alstom Metropolis C851E (Future)
Routes served CCL  Circle line
History
Opened4 March 2009; 15 years ago (2009-03-04)

Kim Chuan Depot is a train depot for the Mass Rapid Transit system in Singapore. The depot is constructed fully underground and provides maintenance, stabling and operational facilities for the Circle line. It is located in Hougang, along Upper Paya Lebar Road, and is accessible via Kim Chuan Road.

It used to be the first depot in Singapore to serve two independently operated MRT lines, until the adjacent Tai Seng Facility Building, became operational with the revenue operation of the Downtown line Stage 3 on 21 October 2017.[1]

  1. ^ "Factsheet: Downtown Line 3 to Open on 21 October 2017 | Press Room | Land Transport Authority". www.lta.gov.sg. Retrieved 13 August 2017.

and 25 Related for: Kim Chuan Depot information

Request time (Page generated in 0.8364 seconds.)

Kim Chuan Depot

Last Update:

Kim Chuan Depot is a train depot for the Mass Rapid Transit system in Singapore. The depot is constructed fully underground and provides maintenance, stabling...

Word Count : 974

Hougang

Last Update:

Hougang planning area in Singapore. Kim Chuan Depot is a train depot for the Mass Rapid Transit system in Singapore. The depot is constructed fully underground...

Word Count : 2706

Tai Seng Facility Building

Last Update:

underground train depot for the Mass Rapid Transit system in Singapore. The depot is constructed towards the east of Kim Chuan Depot and will provide maintenance...

Word Count : 391

Downtown MRT line

Last Update:

the Circle line project. Kim Chuan Depot housed the Operations Control Centre for the Downtown Line Stage 1 until Gali Batu Depot was ready. On 12 October...

Word Count : 3981

Circle MRT line

Last Update:

between 2006 and 2008. They are stabled at Kim Chuan Depot, which was the world's largest underground depot when it opened in 2009. To increase the capacity...

Word Count : 5500

Jurong East MRT station

Last Update:

opens". The Straits Times. "Speech By Mr Raymond Lim At The Visit To Kim Chuan Depot on 25 January 2008". www.mot.gov.sg. Retrieved 11 August 2021.[permanent...

Word Count : 2010

List of Singapore MRT and LRT rolling stock

Last Update:

photos of a transfer of a multi-function vehicle between Bishan Depot and Kim Chuan Depot. Contractors such as Gammon Construction are also known to have...

Word Count : 1221

Boon Lay MRT station

Last Update:

"Speech by Mr Raymond Lim, Minister for Transport, at the Visit to Kim Chuan Depot, 25 January 2008, 9.00am" (Press release). Ministry of Transport. 25...

Word Count : 2302

Haw Par Villa

Last Update:

"SPEECH BY MR RAYMOND LIM,MINISTER FOR TRANSPORT, AT THE VISIT TO KIM CHUAN DEPOT, 25 JANUARY 2008, 9.00 AM". www.nas.gov.sg. Retrieved 22 November 2022...

Word Count : 1719

Dover MRT station

Last Update:

"Speech by Mr Raymond Lim, Minister for Transport, at the Visit to Kim Chuan Depot, 25 January 2008, 9.00am" (Press release). Ministry of Transport. 25...

Word Count : 1340

Tanah Merah MRT station

Last Update:

"Speech by Mr Raymond Lim, Minister for Transport, at the Visit to Kim Chuan Depot, 25 January 2008, 9.00am". Ministry of Transport. 25 January 2008....

Word Count : 1922

Bukit Batok MRT station

Last Update:

"Speech by Mr Raymond Lim, Minister for Transport, at the Visit to Kim Chuan Depot, 25 January 2008, 9.00am". Ministry of Transport (Press release). 25...

Word Count : 382

Pasir Ris MRT station

Last Update:

"Speech by Mr Raymond Lim, Minister for Transport, at the Visit to Kim Chuan Depot, 25 January 2008, 9.00am" (Press release). Ministry of Transport. 25...

Word Count : 3290

Alstom Metropolis C830C

Last Update:

Alstom Metropolis C830C A C830C train at Kim Chuan Depot Interior of C830C. In service 26 June 2015; 8 years ago (2015-06-26) – Present Manufacturer Shanghai...

Word Count : 879

Tuas Link MRT station

Last Update:

"Speech By Mr Raymond Lim, Minister For Transport, At The Visit To Kim Chuan Depot, 25 January 2008, 9.00 am". nas.gov.sg. Ministry of Transport. 25 January...

Word Count : 1466

Bartley MRT station

Last Update:

Eunos Road via a viaduct over the part of the underground site of the Kim Chuan Depot. On 13 August 2003, a section of Bartley Road was realigned for the...

Word Count : 657

Caldecott MRT station

Last Update:

Retrieved 19 November 2020. "Speech By Mr Raymond Lim At The Visit To Kim Chuan Depot on 25 January 2008, 9.00 am". Home – Archives Online. 25 January 2008...

Word Count : 2628

Admiralty MRT station

Last Update:

"Speech by Mr Raymond Lim, Minister for Transport, at the Visit to Kim Chuan Depot, 25 January 2008, 9.00am" (Press release). Ministry of Transport. 25...

Word Count : 1364

Clementi MRT station

Last Update:

"Speech by Mr Raymond Lim, Minister for Transport, at the Visit to Kim Chuan Depot, 25 January 2008, 9.00am" (Press release). Ministry of Transport. 25...

Word Count : 1752

Alstom Metropolis C830

Last Update:

Alstom Metropolis C830 C830 trains at Kim Chuan Depot Interior of the Alstom Metropolis C830 on the Circle line In service 28 May 2009; 15 years ago (2009-05-28)...

Word Count : 520

Tampines MRT station

Last Update:

"Speech by Mr Raymond Lim, Minister for Transport, at the Visit to Kim Chuan Depot, 25 January 2008, 9.00am" (Press release). Ministry of Transport. 25...

Word Count : 2515

Kranji MRT station

Last Update:

"Speech by Mr Raymond Lim, Minister for Transport, at the Visit to Kim Chuan Depot, 25 January 2008, 9.00am". Ministry of Transport (Press release). 25...

Word Count : 1531

Serangoon MRT station

Last Update:

"Speech By Mr Raymond Lim, Minister For Transport, At The Visit To Kim Chuan Depot, 25 January 2008, 9.00 a.m." nas.gov.sg. Archived from the original...

Word Count : 3322

Gul Circle MRT station

Last Update:

"Speech By Mr Raymond Lim, Minister For Transport, At The Visit To Kim Chuan Depot, 25 January 2008, 9.00 am". nas.gov.sg. Ministry of Transport. 25 January...

Word Count : 1402

Haw Par Villa MRT station

Last Update:

Retrieved 9 February 2022. "Speech By Mr Raymond Lim At The Visit To Kim Chuan Depot on 25 January 2008, 9.00 am". Home – Archives Online. 25 January 2008...

Word Count : 1474

PDF Search Engine © AllGlobal.net