Global Information Lookup Global Information

Keystone Pipeline information


Keystone Pipeline System
(partly operational and proposed)
Keystone Pipeline route
Keystone Pipeline route
Location
CountryCanada
United States
General information
TypeCrude oil
OwnerTC Energy
Websitewww.tcenergy.com/operations
Keystone Pipeline
(Phase 1)
Location
FromHardisty, Alberta
Passes throughRegina, Saskatchewan
Steele City, Nebraska
ToWood River, Illinois
Patoka, Illinois (end)
General information
TypeCrude oil
StatusComplete
Construction startedQ2 2008
CommissionedJune 2010[1]
Technical information
Length3,456 km (2,147 mi)
Maximum discharge0.86 million barrels per day (~4.3×10^7 t/a)
Diameter30 in (762 mm)
No. of pumping stations39
Keystone-Cushing Project
(Phase 2)[2]
Location
FromSteele City, Nebraska
ToCushing, Oklahoma
General information
TypeCrude oil
StatusComplete
ContractorsWorleyParsons
Construction started2010
CommissionedFebruary 2011[3]
Technical information
Length468 km (291 mi)
Diameter36 in (914 mm)
No. of pumping stations4
Cushing Marketlink Project
(Phase 3a)[2]
Location
FromCushing, Oklahoma
Passes throughLiberty County, Texas
ToNederland, Texas
General information
TypeCrude oil
StatusComplete
ContractorsWorleyParsons
Construction startedSummer 2012[4]
CommissionedJanuary 2014[5]
Technical information
Length784 km (487 mi)
Maximum discharge0.7 million barrels per day (~3.5×10^7 t/a)
Diameter36 in (914 mm)
Houston Lateral Project
(Phase 3b)[2]
Location
FromLiberty County, Texas
ToHouston, Texas
General information
TypeCrude oil
StatusComplete
ContractorsWorleyParsons
Construction started2013
Commissioned2016,[6] online 2017
Technical information
Length76 km (47 mi)
Keystone XL Pipeline
(Phase 4)[7]
Location
FromHardisty, Alberta
Passes throughBaker, Montana
ToSteele City, Nebraska
General information
TypeCrude oil
StatusCancelled
ContractorsWorleyParsons
Technical information
Length1,897 km (1,179 mi)
Diameter36 in (914 mm)
Websitewww.keystonexl.com

The Keystone Pipeline System is an oil pipeline system in Canada and the United States, commissioned in 2010 and owned by TC Energy and, as of March 2020, the Government of Alberta.[8][9][10][11] It runs from the Western Canadian Sedimentary Basin in Alberta to refineries in Illinois and Texas, and also to oil tank farms and an oil pipeline distribution center in Cushing, Oklahoma.[12][13]

TransCanada Keystone Pipeline GP Ltd,[14] abbreviated here as Keystone, operates four phases of the project. In 2013, the first two phases had the capacity to deliver up to 590,000 barrels (94,000 m3) per day of oil into the Midwest refineries.[15] Phase III has capacity to deliver up to 700,000 barrels (110,000 m3) per day to the Texas refineries.[16] By comparison, production of petroleum in the United States averaged 9.4 million barrels (1.5 million cubic meters) per day in first-half 2015, with gross exports of 500,000 barrels (79,000 m3) per day through July 2015.[17]

A proposed fourth pipeline, called Keystone XL (sometimes abbreviated KXL, with XL standing for "export limited"[18]) Pipeline, would have connected the Phase I-pipeline terminals in Hardisty, Alberta, and Steele City, Nebraska, by a shorter route and a larger-diameter pipe.[19] It would have run through Baker, Montana, where American-produced light crude oil from the Williston Basin (Bakken formation) of Montana and North Dakota would have been added[12] to the Keystone's throughput of synthetic crude oil (syncrude) and diluted bitumen (dilbit) from the oil sands of Canada. It is unclear how much of the oil transported through the pipeline would have reached American consumers instead of being exported to other countries.[20]

The pipeline became well known when the proposed KXL extension attracted opposition from environmentalists with concerns about climate change and fossil fuels. In 2015, KXL was temporarily delayed by President Barack Obama. On January 24, 2017, President Donald Trump took action intended to permit the pipeline's completion. On January 20, 2021, President Joe Biden signed an executive order[21] to revoke the permit[22] that was granted to TC Energy Corporation for the Keystone XL Pipeline (Phase 4). On June 9, 2021, TC Energy abandoned plans for the Keystone XL Pipeline.[23][24]

  1. ^ Cite error: The named reference TransCanada-PR20100630 was invoked but never defined (see the help page).
  2. ^ a b c "Keystone Pipeline System". TransCanada. Archived from the original on May 9, 2015. Retrieved July 19, 2012.
  3. ^ Cite error: The named reference TransCanada-PR20110208 was invoked but never defined (see the help page).
  4. ^ Cite error: The named reference TransCanada-PR20120727 was invoked but never defined (see the help page).
  5. ^ Cite error: The named reference TransCanada-PR20140122 was invoked but never defined (see the help page).
  6. ^ Cite error: The named reference TransCanada-HoustonStatus was invoked but never defined (see the help page).
  7. ^ Koring, Paul (November 6, 2015). "Obama rejects TransCanada's Keystone XL Pipeline". The Globe and Mail. Archived from the original on January 20, 2016. Retrieved November 6, 2015.
  8. ^ "TC Energy – Keystone XL Pipeline". www.tcenergy.com. Retrieved August 23, 2019.
  9. ^ "Keystone XL pipeline project". www.alberta.ca.
  10. ^ "Premier Kenney announces Keystone XL pipeline investment". Province of Alberta. March 31, 2020. Archived from the original on November 7, 2021.
  11. ^ "TC Energy to Build Keystone XL Pipeline". NK Research Corp. Canadian Insider. March 31, 2020.
  12. ^ a b United States Department of State Bureau of Oceans and International Environmental and Scientific Affairs (March 1, 2013). Draft Supplemental Environmental Impact Statement for the Keystone XL Project Applicant for Presidential Permit: TransCanada Keystone Pipeline, LP (SEIS) (PDF) (Report). United States Department of State. Retrieved March 17, 2013.
  13. ^ "The link between Keystone XL and Canadian oilsands production" (PDF). Pembina Institute. April 2011.
  14. ^ "C10418 CER – Letter and Order OPMO-005-2020 – TransCanada Keystone Pipeline GP Ltd. – Keystone XL Pipeline Project – Partial Leave to Open at the Keystone Hardisty Complex". Canadian Energy Regulator. December 15, 2020.
  15. ^ "Keystone Pipeline". Calgary, Alberta, Canada: TransCanada Corporation. Archived from the original on January 16, 2013. Retrieved March 17, 2013.
  16. ^ Cite error: The named reference spacedaily220114 was invoked but never defined (see the help page).
  17. ^ "Short-Term Energy and Winter Fuels Outlook". US Energy Information Administration. Retrieved November 8, 2015.
  18. ^ Rapier, Robert (November 19, 2013). "There's No Stopping the Oil Sands Train". Retrieved January 24, 2017.
  19. ^ "Keystone XL Pipeline » Keystone XL 101". www.keystone-xl.com. Archived from the original on August 24, 2019. Retrieved August 23, 2019.
  20. ^ Zionts, Arielle (March 17, 2022). "Canceled Keystone XL Pipeline project has final hearing in South Dakota". SDPB.
  21. ^ "Protecting Public Health and the Environment and Restoring Science To Tackle the Climate Crisis". Federal Register. 86: 7037. January 20, 2021. Retrieved January 24, 2021.
  22. ^ "Authorizing TransCanada Keystone Pipeline, L.P., To Construct, Connect, Operate, and Maintain Pipeline Facilities at the International Boundary Between the United States and Canada". Federal Register. 84: 13,101. March 29, 2019. Retrieved January 24, 2021.
  23. ^ Puko, Timothy (June 9, 2021). "Keystone XL Oil Project Abandoned by Developer". The Wall Street Journal. ISSN 0099-9660. Retrieved June 9, 2021.
  24. ^ Brown, Matthew (June 9, 2021). "Keystone XL pipeline nixed after Biden stands firm on permit". AP News. Retrieved June 10, 2021.

and 26 Related for: Keystone Pipeline information

Request time (Page generated in 0.7996 seconds.)

Keystone Pipeline

Last Update:

The Keystone Pipeline System is an oil pipeline system in Canada and the United States, commissioned in 2010 and owned by TC Energy and, as of March 2020...

Word Count : 17740

TC Energy

Last Update:

South Dakota in 2017. A third pipeline, the 1,906 km-long Keystone XL Pipeline — which is an expansion of the Keystone Pipeline System — began construction...

Word Count : 3820

2022 Keystone Pipeline oil spill

Last Update:

The Keystone Pipeline oil spill occurred on December 7, 2022, when a leak in the Keystone Pipeline released 14,000 barrels of oil into a creek in Washington...

Word Count : 657

Jasilyn Charger

Last Update:

a youth founder of the Dakota Access Pipeline protests. They have also protested against the Keystone Pipeline, and were arrested for their non-violent...

Word Count : 2115

Tom Steyer

Last Update:

attention on the Keystone Pipeline. Steyer officially left Farallon in 2012. He was criticized by some Republicans for attacking the pipeline even though he...

Word Count : 5910

Ogallala Aquifer

Last Update:

Energy Corporation for the Keystone XL Pipeline (Phase 4). On June 9, 2021, TC Energy abandoned plans for the Keystone XL Pipeline. Since 2010, the North...

Word Count : 4316

Dakota Access Pipeline

Last Update:

The Dakota Access Pipeline (DAPL) or Bakken pipeline is a 1,172-mile-long (1,886 km) underground pipeline in the United States that has the ability to...

Word Count : 9205

History of the petroleum industry in the United States

Last Update:

Environmental Impact Statement for the KEYSTONE XL PROJECT Applicant for Presidential Permit: TransCanada Keystone Pipeline, LP (SEIS) (PDF) (Report). United...

Word Count : 4699

Daryl Hannah

Last Update:

White House as part of a sit-in to protest against the proposed Keystone oil pipeline from Alberta to the U.S. Gulf Coast. In a Huffington Post piece...

Word Count : 3703

Jeremy Grantham

Last Update:

this bubble is coming to an end. He has stated his opposition to the Keystone Pipeline on the basis of the ruinous environmental consequences that its construction...

Word Count : 2024

James Hansen

Last Update:

Minister Joe Oliver lobbied in Washington, DC for approval of the Keystone pipeline extension intended to carry more synthetic crude oil from Canada's...

Word Count : 11754

Keystone

Last Update:

automobile) Keystone (steam automobile) Keystone Pipeline, a crude oil pipeline Keystone-SDA/Keystone-ATS, a Swiss press agency Keystone View Company...

Word Count : 595

Greenpeace USA

Last Update:

demanding President Obama order a halt to construction of the Keystone XL tar sands pipeline. Using flexi-ties to attach themselves to the White House, protesters...

Word Count : 4511

Carlos Curbelo

Last Update:

states to adopt federal education standards, supports building the Keystone Pipeline, supports government funding for the development of renewable energy...

Word Count : 4108

Dakota Access Pipeline protests

Last Update:

early 2015. Tribal members were also among those who opposed the Keystone XL pipeline. In a letter to the Iowa Utilities Board, Tribal chairwoman Judith...

Word Count : 17018

Western Canadian Select

Last Update:

charge of the pipeline system and the Trans Mountain Expansion Project (TMX). TC Energy's Keystone Pipeline System is an oil pipeline system in Canada...

Word Count : 14800

John Shimkus

Last Update:

Shimkus stated he would renew his support for the Keystone Pipeline. The project would be an oil pipeline, bringing Canadian crude oil through the Midwest...

Word Count : 2304

List of oil pipelines

Last Update:

list of oil pipelines. Chad–Cameroon pipeline – Chad–Cameroon Sudeth pipeline – South Sudan–Ethiopia (under construction) Transnet Pipelines – South Africa...

Word Count : 552

Pipelines in Canada

Last Update:

members' pipelines in Canada, including those under construction or newly completed, such as the Trans Mountain pipeline, and TC Energy's Keystone Pipeline expansion—Keystone...

Word Count : 611

Trans Mountain pipeline

Last Update:

The Trans Mountain Pipeline System, or simply the Trans Mountain Pipeline (TMPL), is a multiple product pipeline system that carries crude and refined...

Word Count : 6218

Mimi Walters

Last Update:

district holding gun violence protests. Walters voted in support of the Keystone XL Pipeline Act (H.R. 3) in 2015. As an Assemblywoman, Walters endorsed Proposition...

Word Count : 3704

List of oil spills

Last Update:

from the original on 17 January 2018. Retrieved 16 January 2018. "Keystone Pipeline spill in South Dakota twice as big as first thought", Associated Press...

Word Count : 8740

List of pipeline accidents

Last Update:

The following is a worldwide list of pipeline accidents. 2004: A major natural gas pipeline exploded in Ghislenghien, Belgium near Ath (50 km [ 31 mi ]...

Word Count : 8010

Political positions of Donald Trump

Last Update:

"Donald Trump supports the Keystone pipeline". CNN. Retrieved June 16, 2016. Katie Sanders, CNN's Van Jones says Keystone pipeline only creates 35 permanent...

Word Count : 22821

Tantoo Cardinal

Last Update:

others were arrested while protesting the proposed extension of the Keystone Pipeline. In 2012, she performed the role of Regan in an all-aboriginal production...

Word Count : 749

John Hoeven

Last Update:

the Keystone Pipeline, falsely asserting that it has never leaked and claiming that environmental risks have been exaggerated. The Keystone Pipeline has...

Word Count : 2291

PDF Search Engine © AllGlobal.net