Kapteel Bridge | |
---|---|
Crosses | Manipur River |
Locale | Tedim Township, Chin State |
Official name | Kapteel Bridge |
Maintained by | Ministry of Construction, Union of Myanmar's Government |
Characteristics | |
Design | Suspension bridge |
Total length | 480-foot (150 m) long |
Width | 10-foot-9-inch (3.28 m) wide |
Load limit | 3 tons |
History | |
Construction end | April 25, 2002 |
Opened | April 25, 2002 |
Kapteel Bridge (Zomi: Kapteel Guun Lei) is a bridge in Tedim Township, Chin State, Myanmar and opened on April 25, 2002. Kapteel Bridge is a suspension bridge across Manipur River in Chin State (Zogam).
The bridge is 480 feet (150 m) long and 10 feet 9 inches (3.28 m) wide. The bridge is on Tedim - Kapteel - Rih Lake motor road. Its clearance is 350 feet (110 m) wide and 20 feet (6.1 m) high, and it can bear three tons of load. The bridge was built by Deputy Superintending Engineer U San Win.