Seven trolleybuses lined-up at Ōgizawa Station in 2011. Trolleybus operation ended in 2018 after 54 years.Battery-powered buses at Ōgizawa Station in 2019
The Kanden Tunnel Electric Bus (関電トンネル電気バス, Kanden Tonneru Denki Basu) is a Japanese electric bus line between Ōgizawa Station, Ōmachi and Kurobe Dam Station, Tateyama. The line does not have any official name. The 6.1-km line runs in a tunnel for 5.4 km, the approximately 700-metre above-ground section consisting of around 300 metres of open roadway at and near Ōgizawa station and 400 metres covered by a snow shelter on the approach to the tunnel.[1] Opened in 1964 as a trolleybus line, it was one of the last two trolleybus lines that existed in Japan.[2] The line is a part of the Tateyama Kurobe Alpine Route, together with another trolleybus line, the Tateyama Tunnel Trolleybus. The line closed in November 2018 for renewal, and all of the trolleybuses have been replaced by the new battery-electric buses.[3] All of the overhead wiring was removed and new charging pads were installed at the Ōgizawa terminal.
^Haseldine, Peter (September–October 2017). "Through the Mountains by Trolleybus". Trolleybus Magazine. No. 335. UK: National Trolleybus Association. pp. 176–182. ISSN 0266-7452.
^Murray, Alan (2000). World Trolleybus Encyclopaedia. Yateley, Hampshire, UK: Trolleybooks. ISBN 0-904235-18-1.
^"関電トンネルにおけるトロリーバスの電気バスへの変更について". Kansai Electric Power Company. Retrieved 15 December 2018.
and 8 Related for: Kanden Tunnel Electric Bus information
(also known as trolley bus, trolley coach, trackless trolley, trackless tram – in the 1910s and 1920s – or trolley) is an electricbus that draws power from...
November 2018. Tateyama cable car Tateyama Tunnel trolley bus Tateyama ropeway Kurobe cable car KandenTunnel trolley bus The Tateyama Kurobe Alpine Route involves...
underground (in tunnel), including both termini. It is the last remaining trolleybus line in Japan with the conversion of the KandenTunnel Trolleybus line...
trolleybuses ended in 1995, and the KandenTunnel and Tateyama Tunnel in Japan were non-urban trolleybus tunnels.) On March 30, 1963, the MTA replaced...
entirely in tunnel and serve mainly tourists and hikers in a scenic area. The KandenTunnel line was converted from trolleybuses to battery buses between...
4 mi) KandenTunnel under Mount Akazawa that could efficiently bring supplies from Ōmachi eastward towards the construction site. The tunnel's construction...
1977. Notes for the two tunnel trolleybus lines: The 6.1 km KandenTunnel Trolleybus line operated almost entirely in tunnel, through a mountain, and...