₹4,550 crore (equivalent to ₹64 billion or US$800 million in 2023)
Owner(s)
Adani Green Energy
Solar farm
Type
Flat-panel PV
Site resource
appr 2100 kWh/(m2*yr)
Site area
2,500 acres (1,000 ha)
Power generation
Nameplate capacity
648 MWp
Capacity factor
24 %
Annual net output
Appr. 1.35 TWh/yr
External links
Commons
Related media on Commons
[edit on Wikidata]
Kamuthi Solar Power Project is a photovoltaic power station spread over an area of 2,500 acres (10 km2) in Kamuthi, Ramanathapuram district, 90 km from Madurai, in the state of Tamil Nadu, India.[1] The project was commissioned by Adani Power.[2] With a generating capacity of 648 MWp at a single location, it is the world's 12th largest solar park based on capacity.[3][4]
ABB commissioned five sub-stations to connect the solar park with the National Grid on 13 June 2016.[5][6] The Kamuthi Solar Power Project was completed on 21 September 2016 with an investment of around ₹4,550 crore (equivalent to ₹65 billion or US$820 million in 2023).[7] The solar plant consists of 2.5 million solar modules, 380,000 foundations, 27,000 metres of structures, 576 inverters, 154 transformers, and almost 6,000 km of cables.[8][9] Construction of the structures needed to mount the solar panels required 30,000 tonnes of galvanised steel.[10] Around 8,500 workers installed an average of 11 MW of capacity per day to complete the project within 8 months.[11][12]
The entire solar park is connected to a 400 kV substation of the Tamil Nadu Transmission Corp.[13] The solar panels are cleaned daily by a self-charged robotic system.[14]
Given the solar resource of around 2100 kWh/(m2*yr) an annual generation of 1.35 TWh/yr may be possible.[15] This corresponds to a capacity factor (or average power) of 24% of the peak capacity 648 MWp. Assuming a technical life time of 25 years the investment cost is 700 MUSD/(25*1.35 TWh) = 2 US cent/kWh.
^"India Builds World's Largest Solar Power Plant, Covering 2,500 Acres". CleanTechnica. Archived from the original on 11 September 2018. Retrieved 20 March 2017.
^PTI (15 March 2015). "Adani plans 1,000MW solar power plant at Ramanathapuram". Times of India. Archived from the original on 22 July 2016. Retrieved 14 June 2016.
^"World's largest solar project starts feeding electricity into national grid". Uniindia.com. 9 June 2016. Archived from the original on 28 April 2019. Retrieved 14 June 2016.
^"India unveils the world's largest solar power plant". Al Jazeera. Archived from the original on 31 December 2016. Retrieved 31 December 2016.
^PTI. "ABB links 648 MW solar project at Kamuthi with national grid". Economic Times. Archived from the original on 13 June 2016. Retrieved 14 June 2016.
^"ABB connects power to the Indian grid from one of the world's largest solar plants". Abb.com. Archived from the original on 16 June 2016. Retrieved 14 June 2016.
^"Adani Group launches world's largest solar power plant in Tamil Nadu - Times of India". Archived from the original on 21 September 2016. Retrieved 21 September 2016.
^"Adani dedicates to nation world's largest solar power plant in TN : The Hindu Business Line - Mobile edition". M.thehindubusinessline.com. Archived from the original on 23 September 2016. Retrieved 21 September 2016.
^The Hindu Business Line. "CDM: Adani dedicates to nation world's largest solar power plant in TN". Archived from the original on 23 September 2016. Retrieved 22 September 2016. {{cite web}}: |author= has generic name (help)
^"Kamuthi Solar Power Plant in India is now operational". Alternative energy news and resources updated daily. 29 November 2016. Archived from the original on 27 August 2017. Retrieved 20 March 2017.
^"Gautam Adani unveils world's largest solar power plant in Tamil Nadu". The Economic Times. Archived from the original on 29 December 2016. Retrieved 20 March 2017.
^Bhattacharya, Ananya. "India built the world's largest solar plant in record time". Quartz. Archived from the original on 9 July 2018. Retrieved 20 March 2017.
^Livemint. "CDM: Adani unveils world's largest solar plant in Tamil Nadu". Archived from the original on 22 September 2016. Retrieved 22 September 2016.
^"World's largest solar power plant unveiled in Tamil Nadu". The Indian Express. 30 November 2016. Archived from the original on 31 July 2018. Retrieved 20 March 2017.
^"India Solar Resource - Global Horizontal Irradiance - Annual Average, by NREL, National Renewable Energy Laboratory". Archived from the original on 29 March 2017. Retrieved 6 December 2016.
and 29 Related for: Kamuthi Solar Power Project information
KamuthiSolarPowerProject is a photovoltaic power station spread over an area of 2,500 acres (10 km2) in Kamuthi, Ramanathapuram district, 90 km from...
state of Tamil Nadu. Kamuthi is known for being the home of the KamuthiSolarPowerProject, a large solarpower plant. Kamuthi town is situated in Ramanathapuram...
bidding for 1500 MW capacity was held. The 648-MW KamuthiSolarPowerProject is the biggest operating project in the state. On 1 January 2018, NLC India Limited...
capacity of 1,000 MW, the KamuthiSolarPowerProject with the capacity of 648 MW, the 345 MW Charanka Solar Park, the 480 MW Bhadla Solar Park with a proposed...
Ultra Mega SolarPowerProjects, also known as Ultra Mega Solar Parks, are a series of solarpowerprojects planned by the Ministry of New and Renewable...
thermal power producer, with a capacity of 15,250 MW and operates a mega solar plant of 40 MW at Naliya, Bitta, Kutch, Gujarat. Adani Godda Power is implementing...
Photovoltaic Power Plant went online in 2010. Huanghe Hydropower Golmud Solar Park reached 200 MW in 2012. In August 2012, Agua Caliente SolarProject in Arizona...
minority-owned by TotalEnergies. The company operates KamuthiSolarPowerProject, one of the largest solar photovoltaic plants in the world. The company was...
(Kurnool Solar Park) KamuthiSolarPowerProject, Tamil Nadu 648 MW Maharashtra I SolarPower Plant, Maharashtra 67 MW Telangana I SolarPower Plant, Telangana...
projects aligned with nation-building: Priti Adani". Business Standard India. Press Trust of India. 2019-09-10. Retrieved 2021-03-08. "Our projects aligned...
run operations began. A service agreement was signed with Tata Power to produce power for handling coal cargo imports. Also in 2007, equity shares in...
green hydrogen projects such as low-carbon power generation, as well as the manufacture of hydrogen fuel cells, wind turbines, solar modules and batteries...
PowerProject owned by Tata Power Mundra Port "Indonesian nightmare for Tata, Adani, JSW, Lanco". dna. "Mundra world's largest coal-fired pvt power plant"...
Bikaner-Khetri transmission project in Rajasthan. In July 2020, the company signed definitive agreements with Kalpataru Power Transmission (KPTL) for acquiring...
world's largest solar bid by the Solar Energy Corporation of India (SECI) worth US$6 billion. The 8000MW photovoltaic power plant project will be taken...
flight". The Times of India. ProQuest 1811426609. "Airport rooftop solar array joins power grid". The Times of India. 22 March 2017. Retrieved 5 March 2021...
Udupi Power Plant is a coal based thermal power station in Karnataka, India, established in 2008. It is located to the north of Mangalore, west of Belmannu...
Retrieved 28 January 2019. Umarji, Vinay (2014-11-12). "Pranav Adani: Powering ahead". Business Standard India. Retrieved 2022-05-15. "26/11 Stories of...
total population of project will be 31,108 persons. Adequate provision will be made for the heavy vehicle parking at the project site to allow smooth...
building a solarpower equipment plant. In September, Adani Green Energy (Tamil Nadu), the renewable wing of the Adani Group, began operations in Kamuthi in Ramanathapuram...
acquisition a land area covering about 2,100 hectares in 2017. The new airport project has received in-principle approval from the state government, and the JDA...
ATC tower, built by the Airports Authority of India (AAI) at an overall project cost of about ₹2.80 billion, was functional from 1999 to 2013. During that...
making the total cost 31,000 crore. The Vizhinjam Seaport project is the first and only port project in India to receive VGF funding. There is no littoral...