Global Information Lookup Global Information

K13 Harpe Bru Bridge information


K13 Harpe Bru Bridge is the first extradosed cable-stayed bridge in Norway.[1][2]

Bridge towers

Technical information:

  • Extradosed Stay Cable Bridge (Length 320m)
  • spans 45+65+100+65+45m
  • foundations – piles/flat (founded on rock)
  • pylons height 16,0m

Owner:

  • Statens Vegvesen

Design:

  • Johs Holt AS

Checking engineering:

  • COWI AS

Contractor:

  • Implenia Construction SA

Completion: October 2015

  1. ^ "Implenia | References | Statens vegvesen | K13 Harpe bridge / K14 Solhaug bridge / K21 Vinstersletta bridge". norway.implenia.com. Retrieved 2020-03-10.
  2. ^ "Norway building first bridge of new type". The Norwegian American. 2016-01-21. Retrieved 2020-03-10.

and 1 Related for: K13 Harpe Bru Bridge information

Request time (Page generated in 0.8544 seconds.)

K13 Harpe Bru Bridge

Last Update:

K13 Harpe Bru Bridge is the first extradosed cable-stayed bridge in Norway. Technical information: Extradosed Stay Cable Bridge (Length 320m) spans 45+65+100+65+45m...

Word Count : 109

PDF Search Engine © AllGlobal.net