Jirau Dam information


Jirau Dam
Site of the Jirau Dam
Jirau Dam is located in Brazil
Jirau Dam
Location of the Jirau Dam in Brazil
Official nameUsina Hidrelétrica Santo Antônio Jirau
LocationRondônia, Brazil
Coordinates9°16′00″S 64°38′57″W / 9.26667°S 64.64917°W / -9.26667; -64.64917
StatusOperational
Construction beganDecember 2008
Opening dateDecember 2016
Construction costUS$8 billion
Owner(s)Camargo Correa
Operator(s)Eletronorte
Dam and spillways
Type of damEmbankment, concrete gravity composite
ImpoundsMadeira River
Height63 m (207 ft)
Length1,500 m (4,921 ft)
Dam volume2,000,000 m3 (70,629,333 cu ft) (embankment)
Spillway typeOverflow, 21 controlled gates
Spillway capacity82,000 m3/s (2,895,803 cu ft/s)
Reservoir
Surface area258 km2 (100 sq mi)
Power Station
Operator(s)Eletronorte
Commission date2013–2016
Hydraulic head15.10 m (50 ft)
Turbines50 x 75 MW bulb turbines
Installed capacity3,750 MW
Annual generation19 100 GWh
Website
www.energiasustentaveldobrasil.com.br

The Jirau Dam is a rock-fill dam with an asphalt-concrete core, currently under construction on the Madeira River in the state of Rondônia, Brazil. The dam's hydroelectric power stations will have 50 turbines each 75 MW resulting total installed capacity of 3,750 MW. The power plant's first unit was commissioned in September 2013,[1] the 16th in November 2014,[2] 24th in February 2015,[3] the 41st in December 2015,[4] and the last in December 2016.[5] Most of the power is designed to be exported to south-eastern Brazil via the Rio Madeira HVDC system.

The dam is part of a planned four power plant Madeira river hydroelectric complex, which will consist of two dams in Brazil (3,580 MW Santo Antônio Dam at the city of Porto Velho and Jirau), a third on the border of Brazil and Bolivia, and a fourth station inside Bolivia. Two of these, Santo Antonio and Jirau, are currently under construction, while the smaller upstream dams are still in the planning stages. In part due to the 2001–2002 power shortage in Brazil, construction of both dams was accelerated in 2009. The total estimated cost of the two facilities currently under construction is $15.6 billion ($8 billion for Jirau), including about $10 billion for the civil engineering and power plants, and $5 billion for ship locks, transmission lines, and environmental re-mediation.[6] The Madeira river hydroelectric complex is part of the Initiative for the Integration of the Regional Infrastructure of South America, an effort by South American governments to integrate the continent's infrastructure with new investments in transportation, energy, and communication.[7] Construction on the project was temporary halted in March 2011, February 2012 and April 2013 due to worker riots or strikes.[8][9]

The Brazilian Development Bank approved an additional US$1.6 billion for the project in September 2012. The extra funding will add six more 75 MW bulb turbine-generators to the power station (a total of 50) and pay for transmission lines.[10]

  1. ^ Enerdata: First 75 MW turbine commissioned at 3,750 MW Jirau dam
  2. ^ "Aneel authorizes 16th turbine hydroelectric Jirau, in Rondônia". Rondonia. 4 November 2014. Retrieved 26 January 2015.
  3. ^ Harris, Michael (27 February 2015). "Commissioning of turbines at Brazil's 3,750-MW Jirau nearing halfway point". HydroWorld.com. Retrieved 1 August 2015.
  4. ^ "UHE Jirau fecha o ano com 41 turbinas em operação". Energia Sustentável do Brasil. 22 December 2015. Archived from the original on 17 February 2017. Retrieved 1 February 2016.
  5. ^ "Archived copy" (PDF). Archived from the original (PDF) on 28 April 2019. Retrieved 23 August 2017.{{cite web}}: CS1 maint: archived copy as title (link)
  6. ^ "Brazil to Build $15.6 Billion in Dams in Amazon Region". Water World – PennWell Corporation. Retrieved 2 April 2011.
  7. ^ José María Díaz Batanero (February 2010). Initiatives for the Improvement of the South American Market of Roaming Services Analysis and Recommendations (Report) (in Spanish). IIRSA. Retrieved 7 July 2011.
  8. ^ The New York Times: Amid Brazil’s Rush to Develop, Workers Resist
  9. ^ "Workers remain on strike in hydro Jirau and Santo Antônio". Reuters (in Portuguese). 11 April 2013. Archived from the original on 4 March 2016. Retrieved 1 June 2013.
  10. ^ "Brazil's development bank approves new loan for Jirau dam". Reuters. 28 September 2012. Retrieved 26 February 2013.[dead link]

and 13 Related for: Jirau Dam information

Request time (Page generated in 0.7791 seconds.)

Jirau Dam

Last Update:

The Jirau Dam is a rock-fill dam with an asphalt-concrete core, currently under construction on the Madeira River in the state of Rondônia, Brazil. The...

Word Count : 1918

Madeira River

Last Update:

hydroelectric dams on the Madeira River, the Santo Antônio Dam near Porto Velho and the Jirau Dam about 100 km upstream. Both the Jirau and Santo Antonio dams are...

Word Count : 1868

List of largest hydroelectric power stations

Last Update:

listed. The Three Gorges Dam in Hubei, China, has the world's largest instantaneous generating capacity (22,500 MW), with Baihetan Dam from the same nation...

Word Count : 1376

Dilma Rousseff

Last Update:

000 workers at the Jirau Dam site went on strike for over three weeks, and later some began looting company stores, setting fire to dam structures, and destroying...

Word Count : 14804

List of hydroelectric power stations in Brazil

Last Update:

portal Renewable energy portal List of power stations in Brazil List of dams and reservoirs in Brazil "Visão Geral do Setor". Associação Brasileira de...

Word Count : 231

List of largest power stations

Last Update:

the Three Gorges Dam. The proposed Grand Inga Dam in the Congo would surpass all existing power stations, including the Three Gorges Dam, if construction...

Word Count : 5747

Mujica Nava Ecological Station

Last Update:

but excluded the area that would be flooded by the Jirau Dam to create the reservoir for the Jirau Hydroelectric Power Plant. The added land had formerly...

Word Count : 483

List of dams and reservoirs in Brazil

Last Update:

Many of the dams and reservoirs in Brazil listed below are used primarily used to produce hydroelectric power. Other uses include flood control, irrigation...

Word Count : 39

Rio Vermelho State Forest

Last Update:

but excluded the area that would be flooded by the Jirau Dam to create the reservoir for the Jirau Hydroelectric Power Plant. In July 2013 the Attorney...

Word Count : 949

Electricity sector in Brazil

Last Update:

gave approval for the construction of two new dams, the Jirau Dam (3,300 MW) and the Santo Antônio Dam (3,150 MW), on the Madeira River in the state of...

Word Count : 5964

List of conventional hydroelectric power stations

Last Update:

Jirau dam (Brazil)". Enerdata. 30 June 2015. Archived from the original on March 4, 2016. Retrieved November 15, 2018. "Usina hidrelétrica de Jirau vai...

Word Count : 4598

Mapinguari National Park

Last Update:

but excluded the area that would be flooded by the Jirau Dam to create the reservoir for the Jirau Hydroelectric Power Plant. The added land had formerly...

Word Count : 756

Clean Development Mechanism

Last Update:

projects. As of 2014, the largest power plant to receive CDM support was the Jirau Hydroelectric Plant in Brazil. Renewable energy In the initial phase of...

Word Count : 9046

PDF Search Engine © AllGlobal.net