Gordie Howe International Bridge information


Gordie Howe International Bridge
Rendering of the bridge by Windsor–Detroit Bridge Authority
Coordinates42°17′15″N 83°05′52″W / 42.28750°N 83.09778°W / 42.28750; -83.09778
Carries6 lanes connecting Gordie Howe International Bridge I-75 and Gordie Howe International Bridge Highway 401 plus a bike and pedestrian lane
CrossesDetroit River, Canada–United States border
LocaleDetroit, Michigan and Windsor, Ontario
Websitewww.gordiehoweinternationalbridge.com/en
Characteristics
DesignCable-stayed bridge
Total length2.5 km (1.6 mi)[1]
Width37.5 m (123 ft)[1]
Height220 m (722 ft)[1]
Longest span853 m (0.53 mi)[1]
Piers in water0
Clearance below42 m (138 ft)[1]
History
Construction startJune 2018[2]
Construction costCA$5.7 billion (estimated)[1]
Opening2025 (expected)[3]
Location
Map

The Gordie Howe International Bridge (French: Pont International Gordie-Howe), known during development as the Detroit River International Crossing and the New International Trade Crossing, is a cable-stayed international bridge across the Detroit River, currently under construction. The crossing will connect Detroit, Michigan, United States of America and Windsor, Ontario, Canada by linking Interstate 75 in Michigan with Highway 401 in Ontario (through the Rt. Hon. Herb Gray Parkway extension of Highway 401). The bridge will provide uninterrupted freeway traffic flow, as opposed to the current configuration with the nearby Ambassador Bridge that connects to city streets on the Ontario side. The bridge is named after Canadian ice hockey player Gordie Howe, whose celebrated career included 25 years with the Detroit Red Wings, and who died two years before construction began.

First proposed in the early 2000s, the project was met with prominent opposition by Ambassador Bridge owner Manuel "Matty" Moroun, who believed competition from a publicly owned bridge would reduce his revenue. A Canadian federal Crown corporation, the Windsor–Detroit Bridge Authority, was established in 2012 to coordinate the bridge's construction and management. Environmental approvals and other permits were approved in the United States and Canada in the early 2010s. Lawsuits by Moroun alleged that the crossing agreement was illegal and the Ambassador Bridge had "exclusivity rights". These lawsuits were denied, along with various attempts to stop property expropriations, allowing the project to continue.

The "Bridging North America" consortium was selected in July 2018 to design, build, operate and maintain the bridge, and construction began that month. The CA$3.8 billion cost of construction will be funded by the Canadian federal government, paid for by bridge tolls. Construction is expected to be completed in 2025.

  1. ^ a b c d e f "Gordie Howe Bridge By the Numbers". Archived from the original on January 30, 2022. Retrieved July 10, 2021.
  2. ^ Battagello, Dave (April 12, 2013). "New Detroit crossing seven years away". Windsor Star. Archived from the original on April 12, 2014. Retrieved August 4, 2013.
  3. ^ Molnar, Dale (November 30, 2022). "Gordie Howe Bridge completion date likely in 2025, later than initial estimates: officials". Canadian Broadcasting Corporation. Archived from the original on March 30, 2023. Retrieved March 30, 2023.

and 19 Related for: Gordie Howe International Bridge information

Request time (Page generated in 1.0315 seconds.)

Gordie Howe International Bridge

Last Update:

The Gordie Howe International Bridge (French: Pont International Gordie-Howe), known during development as the Detroit River International Crossing and...

Word Count : 7174

Gordie Howe Bridge

Last Update:

Gordie Howe Bridge may refer to: Gordie Howe International Bridge, Detroit River crossing under construction between Detroit and Windsor Gordie Howe Bridge...

Word Count : 63

Gordie Howe

Last Update:

known as the Gordie Howe International Bridge. Canadian actor Michael Shanks portrayed Howe in the television film Mr. Hockey: The Gordie Howe Story. The...

Word Count : 6981

Ambassador Bridge

Last Update:

construction of the Gordie Howe International Bridge proposed by the Detroit River International Crossing (DRIC) commission. The new bridge further downriver...

Word Count : 3665

Ontario Highway 401

Last Update:

extension turns and runs alongside the E.C. Row towards the future Gordie Howe International Bridge. An 8-kilometre (5.0 mi) section of the parkway, east of the...

Word Count : 16107

Southwestern Ontario

Last Update:

gordiehoweinternationalbridge.com/en/Gordie-Howe-International-Bridge-Opening-Planned-for-Fall-2025". Gordie Howe International Bridge. January 4, 2024. Retrieved...

Word Count : 3146

Detroit River

Last Update:

are secured by the United States Border Patrol. The Gordie Howe International Bridge is a new bridge project which began construction in 2019; it will directly...

Word Count : 4144

List of bridges in Canada

Last Update:

QC Gordie Howe International Bridge − Windsor – Detroit, MI Garden City Skyway − St. Catharines Heron Road Bridge − Ottawa Hogg's Hollow Bridge − Toronto...

Word Count : 4374

Detroit

Last Update:

planned new Detroit–Windsor bridge, now the Gordie Howe International Bridge. Canada had already planned to pay for 95% of the bridge, which will cost $2.1 billion...

Word Count : 22394

List of bridges in the United States

Last Update:

list of the major current and former bridges in the United States. For a more expansive list, see List of bridges in the United States by state. This table...

Word Count : 5118

Harbor Bridge Project

Last Update:

cable-stayed, concrete segmental bridge in the North America. If completed before the Gordie Howe International Bridge, also under construction, it will...

Word Count : 1220

Manuel Moroun

Last Update:

States and Canadian governments have agreed to build the Gordie Howe International Bridge, a bridge between Detroit and Windsor to be located downriver, and...

Word Count : 1435

Michigan

Last Update:

Walpole Island First Nation, Ontario) The Gordie Howe International Bridge, a second international bridge between Detroit and Windsor, is under construction...

Word Count : 15958

Michigan Central Railway Tunnel

Last Update:

Gateway, was scrapped in 2015, upon the approval of the proposed Gordie Howe International Bridge. Canadian Pacific took full ownership of the tunnel in December...

Word Count : 994

Erik Behrens

Last Update:

sand-colored structures. He is the architect of the Gordie Howe International Bridge the longest Cable-stayed bridge in North America. Erik Behrens and James Haig...

Word Count : 573

Caesars Windsor

Last Update:

Ambassador Bridge Detroit–Windsor Tunnel Essex Terminal Railway Gordie Howe International Bridge (under construction) Transit Windsor Windsor International Airport...

Word Count : 1277

Ontario Highway 402

Last Update:

that situation is expected to be rectified after the planned Gordie Howe International Bridge is constructed. Although Highway 402 passes through Sarnia...

Word Count : 3671

Highway revolt

Last Update:

began in late 2011 and was completed in 2015. The proposed Gordie Howe International Bridge, which will continue Ontario 401 through the Delray neighborhood...

Word Count : 2753

University of Windsor

Last Update:

Member of Parliament Kevin Hanchard, actor Mark Hominick, UFC fighter Marie Howe, poet Dario Hunter, the first Muslim-born person to be ordained a rabbi....

Word Count : 6052

PDF Search Engine © AllGlobal.net