Global Information Lookup Global Information

Edgewood Cutoff information


The Edgewood Cutoff is a 169-mile (273 km) single-track railroad line that runs in a north–south direction through southern Illinois and western Kentucky. Built by the Illinois Central (IC) Railroad, the Kentucky section of the line opened in 1927 and the Illinois section in 1928. The line is named for the hamlet of Edgewood, Illinois where the northern end of the cutoff diverges from the IC mainline. At the southern end, the line rejoins the IC mainline at Fulton, Kentucky at the Tennessee border. The Edgewood Cutoff was built to ease traffic congestion on the IC mainline primarily caused by the single-track bridge over the Ohio River at Cairo, Illinois. (The cutoff crosses the Ohio River at Metropolis, Illinois using the Paducah and Illinois Railroad's bridge.)[1]

Due to its location, east of the IC mainline, trains running from Chicago to New Orleans would shave 22 miles (35 km) from their route by using the cutoff. Trains to and from St. Louis, however, would continue to use the old mainline through Cairo, as would all IC passenger trains. Even so, the cutoff would especially benefit heavy coal trains coming from western Kentucky.[1]

The gradient profile of the line was a significant improvement over the old mainline, with a maximum of a 0.3% grade versus 1.2% on the Cairo line. The number of curves was greatly reduced as well. In fact, one section of tangent (straight) track on the cutoff is 63 miles (102 km) long. Sidings were located along the cutoff to permit trains to pass each other on the single-track line. The construction of three tunnels was necessitated along the route, all of which are located within the remote forested region of southern Illinois.[1]

The IC spent approximately $17 million to build the Edgewood Cutoff. IC had also studied the possibility of reconstructing the Cairo line, although that project was estimated at $24 million and was never pursued. After the IC announced plans to build the cutoff on Christmas Day 1922, several communities along the Cairo route filed lawsuits to stop the new line from being built. They were unsuccessful.[1]

After the cutoff opened, more and more trains were diverted to the new line, until within a few years the cutoff was handling more tonnage than the old line. In 1972, IC merged with GM&O to form the Illinois Central Gulf (ICG). The name was changed back to Illinois Central in 1988. Canadian National acquired IC in 1999 and instituted changes such as running most southbound trains over the Edgewood Cutoff and most northbound trains over the Cairo line. Amtrak currently uses the Cairo line. No passenger trains have ever been scheduled to run on the Edgewood Cutoff.[1]

  1. ^ a b c d e IC's Cairo Bridge, Clifford J. Downey, Classic Trains, Winter 2012.

and 16 Related for: Edgewood Cutoff information

Request time (Page generated in 0.8211 seconds.)

Edgewood Cutoff

Last Update:

The Edgewood Cutoff is a 169-mile (273 km) single-track railroad line that runs in a north–south direction through southern Illinois and western Kentucky...

Word Count : 478

Edgewood

Last Update:

Edgewood may refer to: Edgewood, British Columbia, a settlement Edgewood, California, a census-designated place Edgewood, Florida, a city Edgewood, Illinois...

Word Count : 520

Railroad cutoff

Last Update:

old route rather than a replacement. An example of this would be the Edgewood Cutoff, which has served as a complement, rather than a replacement, to the...

Word Count : 738

Evansville Western Railway

Last Update:

terminating with a loading loop north of the Akin Junction on CN's existing Edgewood Cutoff line, thus giving the Evansville Western railroad interchange access...

Word Count : 755

Winston Tunnel

Last Update:

tunnels are located on the Canadian National (ex-Illinois Central) Edgewood Cutoff Line, the longest being Tunnel #2 near Abbot, Illinois which is 6,994...

Word Count : 1015

Washington State Route 161

Last Update:

Graham and South Hill before reaching Puyallup and the communities of Edgewood, Milton, and Lakeland South before reaching Federal Way. SR 161 was established...

Word Count : 1922

Metropolis Bridge

Last Update:

the bridge served as an important link in their newly completed Edgewood-Fulton Cutoff route. As of 2013, the bridge is still owned by the Paducah and...

Word Count : 273

Lake Tahoe

Last Update:

monument marking the oblique California border, which is now surrounded by Edgewood Tahoe golf resort that is claimed and taxed by Nevada. A federal survey...

Word Count : 16043

Interstate 75 in Georgia

Last Update:

is a spur from near Marietta north to Canton and Nelson, and I-675 is a cutoff from I-75 south of Atlanta north to I-285 (Atlanta's perimeter)—east of...

Word Count : 3580

Muscogee County School District

Last Update:

Elementary School Downtown Elementary School Eagle Ridge Academy School Edgewood Elementary School Forrest Road Elementary School Fox Elementary School...

Word Count : 858

List of James River plantations

Last Update:

daily. Edgewood and Harrison's Mill is a unique surviving example of Gothic Revival architecture along State Route 5 and the James River. Edgewood was once...

Word Count : 6426

List of Northeast Corridor infrastructure

Last Update:

Susquehanna River 65.5 Aberdeen Aberdeen NR MARC 72.1 Edgewood Bush River Bridge 75.1 Edgewood MARC 78.9 Gunpowder River Bridge 84.0 Middle River Martin...

Word Count : 299

List of Pittsburgh History and Landmarks Foundation Historic Landmarks

Last Update:

Library and Edgewood Club C. C.C. C. Mellor Library and Edgewood Club 1914 Lee Edward B.Edward B. Lee Pennwood and West Swissvale Avenues Edgewood 2000 Mexican...

Word Count : 382

Iowa Highway 38

Last Update:

absorbed all of Iowa 113, which had connected Monticello to Iowa 10 near Edgewood. 2010 Volume of Traffic on the Primary Road System of Iowa (PDF) (Report)...

Word Count : 742

Akins High School

Last Update:

Retrieved 2021-10-12. "UIL Reclassification and Realignment Conference Cutoff Numbers 2022-2023 & 2023-2024" (PDF). www.UILTexas.org. University Interscholastic...

Word Count : 715

Permanente Quarry

Last Update:

Portland cement. In 1908 Southern Pacific Railroad completed the Mayfield Cutoff which ran from Mayfield (now part of Palo Alto), along the west side of...

Word Count : 10047

PDF Search Engine © AllGlobal.net