Global Information Lookup Global Information

Derrickhand information


Unlatching pipe

A derrickhand or derrickman is the person who sits atop the derrick on a drilling rig.[1] Though the exact duties vary from rig to rig, they almost always report directly to the driller.[2] Their job is to guide the stands of the drill pipe into the fingers at the top of the derrick. Other duties might include monitoring pH and calcium levels, viscosity and the mud weight (density), adding chemicals and oil based fluids, and being responsible for the shale shakers and mud pump.

  1. ^ Macondo: The Gulf Oil Disaster, Chief Counsel's Report, 2011. Government Printing Office. p. 33. ISBN 978-0-16-091549-9. A derrickhand works from the rig's derrick to assist with drilling operations.
  2. ^ Center, Petrogav International Oil & Gas Training (2020-06-28). JOB INTERVIEW Offshore Drilling Rigs. Petrogav International. p. 216. The Derrickhand or derrickman position varies greatly from one drilling rig to another. He almost always reports directly to the driller. The name derrickman comes from the position that he normally occupies, which is at the top of the derrick.

and 7 Related for: Derrickhand information

Request time (Page generated in 0.7407 seconds.)

Derrickhand

Last Update:

A derrickhand or derrickman is the person who sits atop the derrick on a drilling rig. Though the exact duties vary from rig to rig, they almost always...

Word Count : 389

Roughneck

Last Update:

rig's machinery during drilling, as well as most other rig operations. Derrickhand (derrick-man): Responsible for the drilling mud, the mud pits where drilling...

Word Count : 1001

Licence to Drill

Last Update:

Buchinski – drilling supervisor Tyson Pages – driller Darcy Blancher – derrickhand MGM team page The Nabors team base camp, known as Rig 99, is located...

Word Count : 688

Oil platform

Last Update:

Roustabouts Company man Mud engineer Motorman See: Glossary of oilfield jargon Derrickhand Geologist Welders and Welder Helpers Well services crew will be on board...

Word Count : 6164

Mud logging

Last Update:

exceptions such as the mud weight and mud viscosity which are measured by the derrickhand or the mud engineer. Rate of drilling is affected by the pressure of...

Word Count : 1528

Mud engineer

Last Update:

independent drilling fluids company presently in West Africa Boring Derrickhand Drilling mud Drilling rig Marsh funnel Oil well Society of Petroleum...

Word Count : 1255

Service Rigs

Last Update:

floor, as well as hauling pipe, maintaining equipment and cleaning up. Derrickhands are more experienced workers who assemble the pump truck, monitor circulations...

Word Count : 713

PDF Search Engine © AllGlobal.net