The DSDP368 was an area that was drilled as part of the Deep Sea Drilling Project that took place below the Cape Verde Rise. The area was drilled from...
from February 22 to March 1, 1975 by the ship Glomar Challenger before DSDP368 was drilled. Its location was at 12°29.2'N and, 20°02.8'W and is located...
Program, two research drillings were done so far, the DSDP368 and the ODP 659. At the DSDP368 location which was drilled 985 meters deep, it is divided...
sédimentation pendant le Néogène en Méditerranée d'après les Forages JOIDES-DSDP". University of Milan Institute of Geology and Paleontology Publication (in...
2004). "Rates of carbonate cementation associated with sulphate reduction in DSDP/ODP sediments: implications for the formation of concretions" (PDF). Chemical...