Global Information Lookup Global Information

Cross River Rail information


Cross River Rail
Cross River Rail construction site at Roma Street station in central Brisbane
Cross River Rail construction site at Roma Street station in central Brisbane
Overview
StatusUnder construction
OwnerQueensland Government
LocaleBrisbane, Queensland, Australia
Termini
  • Dutton Park station
  • Exhibition station
Stations6
Websitecrossriverrail.qld.gov.au
Service
TypeCommuter rail / rapid transit
SystemQueensland Rail City network
Operator(s)Queensland Rail
Rolling stockNew Generation Rollingstock
History
Planned opening2026
Technical
Line length10.2 km (6.3 mi)
Track gauge1,067 mm (3 ft 6 in)
Route map

Legend
Cross River Rail
Cross River Rail
Cross River Rail
other lines
km
 
Airport, Caboolture, Doomben,
Cross River Rail
Sunshine Coast
and Shorncliffe lines
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Ferny Grove line
Cross River Rail
Cross River Rail
Bowen Hills
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Bowen Hills
(original site)
Cross River Rail
Cross River Rail
Bowen Hills
(second site)
Cross River Rail
Cross River Rail
3.4
Exhibition
Cross River Rail
Cross River Rail
1.3
Fortitude Valley
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
0.0
Central
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
0.8
Roma Street
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Ipswich & Rosewood
and Tennyson lines
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Pacific Motorway
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Merivale Bridge
over Brisbane River
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
2.6
South Brisbane
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Albert Street
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
3.5
South Bank
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Woolloongabba
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Fisherman Islands
standard gauge freight line
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
5.1
Park Road
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Boggo Road
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cleveland line
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Fisherman Islands
standard gauge freight line
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Pacific Motorway
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
Cross River Rail
5.9
Dutton Park
Cross River Rail
Beenleigh, Gold Coast
and Tennyson lines

Cross River Rail is an underground heavy rail project currently under construction in Brisbane, Queensland, Australia. The project will see the development of a new rail line underneath Brisbane River, alongside the redevelopment of a number of stations in the Brisbane central business district and along the Beenleigh railway line. The business case for the project was released in August 2017, with construction work officially beginning in September that year.[1][2] The project replaced the planned 2013 BaT Tunnel, which in turn had replaced the original 2010 Cross River Rail proposal.[3] It is the largest infrastructure megaproject ever undertaken in Queensland.

Cross River Rail consists of a new 10.2 km (6.3 mi) line through the CBD from Dutton Park in the city's south to Bowen Hills in the city's north, connecting existing Brisbane rail lines. The project includes 5.9 km (3.7 mi) of twin tunnels and will deliver four new underground stations at Boggo Road, Woolloongabba, Albert Street and Roma Street, with Exhibition station upgraded. Tunnelling for the project was completed in 2021, with construction planned to be complete by 2025 and the new line operational by early 2026.[4]

The project provides a second rail crossing of the Brisbane river due to concerns that the only inner-city rail river crossing, the Merivale Bridge, would reach capacity.[5] According to the project's business case, without the new tunnel overcrowding on most lines would be expected by 2026.[1] Cross River Rail is considered to be the highest infrastructure priority by the Queensland Government.[6] Infrastructure Australia evaluated the business case in 2017 and expressed concerns that the rail patronage projections may not be achieved and that the benefits in the business case may be overstated.[7] However, Infrastructure Australia still listed Cross River Rail as a priority project.

Under the plan, Queensland Rail Citytrain will operate in three sectors, all connecting at the existing or new underground Roma Street stations. Sector One will connect the Gold and Sunshine Coasts directly, operating trains from Varsity Lakes and Beenleigh through to Redcliffe Peninsula, Nambour and Gympie. Sector Two will link the Rosewood and Springfield lines through Central to the domestic airport and Shorncliffe. Sector Three will run Ferny Grove trains through Central and Southbank to Cleveland.[8]

  1. ^ a b Cite error: The named reference bc2017 was invoked but never defined (see the help page).
  2. ^ Cite error: The named reference :2 was invoked but never defined (see the help page).
  3. ^ BaT Tunnel scrapped as government looks for different cross river rail line Archived 9 September 2015 at the Wayback Machine Brisbane Times 6 March 2015
  4. ^ O'Neal, Danielle (31 March 2023). "Queensland government reveals Cross River Rail cost blowout of $960 million, now not due to open til 2026". ABC News. Australian Broadcasting Corporation. Archived from the original on 31 March 2023. Retrieved 31 March 2023.
  5. ^ Sarah Vogler; Steven Wardill (13 June 2017). "Queensland Budget: $2 billion for Cross River Rail". The Courier-Mail. News Corp. Retrieved 19 June 2017.
  6. ^ "Cross River Rail". Infrastructure projects. The State of Queensland. 9 May 2017. Archived from the original on 6 July 2017. Retrieved 19 June 2017.
  7. ^ "Project Evaluation Summary: Cross River Rail" (PDF). Archived (PDF) from the original on 7 November 2017. Retrieved 8 November 2017.
  8. ^ "Gold Coast, Beenleigh rail users face major changes as Brisbane's Cross River Rail network is revealed - ABC News". Archived from the original on 13 August 2022. Retrieved 13 August 2022.

and 24 Related for: Cross River Rail information

Request time (Page generated in 0.9048 seconds.)

Cross River Rail

Last Update:

Cross River Rail is an underground heavy rail project currently under construction in Brisbane, Queensland, Australia. The project will see the development...

Word Count : 4041

Dutton Park railway station

Last Update:

services. On 1 April 2023, the station was temporarily closed for Cross River Rail works and is expected to reopen in late 2024. Dutton Park station opened...

Word Count : 686

Cross River

Last Update:

Cross River may refer to: Cross River (British Columbia), a tributary of the Kootenay River Cross River (Nigeria) Cross River gorilla (Gorilla gorilla...

Word Count : 163

Railways in South East Queensland

Last Update:

North-west rail line branching from Cross River Rail at Alderley to Strathpine. Queensland Rail operates ten suburban and three interurban rail lines across...

Word Count : 3762

Roma Street railway station

Last Update:

tenants. According to the Cross River Rail Construction plan, new underground platforms will be constructed to service Cross River Rail services. The next stations...

Word Count : 1258

Yeronga railway station

Last Update:

services to Corinda via the Yeerongpilly–Corinda line. As a part of Cross River Rail, Yeronga and 7 other stations was rebuilt. As a result, there was a...

Word Count : 282

Brisbane Metro

Last Update:

expected total cost of the project is $1.7 billion. Together with Cross River Rail, the project is intended to boost public transport reliability in Brisbane...

Word Count : 1978

Albert Street railway station

Last Update:

station is a railway station currently under construction as part of the Cross River Rail project in the Brisbane central business district, Queensland, Australia...

Word Count : 430

2032 Summer Olympics

Last Update:

Cross River Rail, scheduled to be completed in 2024, is an underground railway project through central Brisbane, which is under construction. Cross River...

Word Count : 4430

Commuter rail

Last Update:

electrified lines converging in the city centre. Cross River Rail is an under construction underground cross-city tunnel to relieve pressure on this network...

Word Count : 7430

Gold Coast railway line

Last Update:

Plains and Loganlea during off-peak hours. From 2025, the line will use Cross River Rail and stop at three new stations in the inner city. The South East Queensland...

Word Count : 1459

Queensland

Last Update:

CityCat, Cross River, and CityHopper services which have dedicated wharves along the Brisbane River. The G:link, Queensland's only light rail network,...

Word Count : 10393

Cross River State

Last Update:

Cross River State is a state in the South-South geopolitical zone of Nigeria. Named for the Cross River, the state was formed from the eastern part of...

Word Count : 3052

Boggo Road railway station

Last Update:

station is a railway station currently under construction as part of the Cross River Rail project in the Brisbane suburb of Dutton Park in Queensland, Australia...

Word Count : 398

Brisbane Live

Last Update:

Queensland, Australia. The project is being developed in conjunction with Cross River Rail. The venue will be the location for swimming events at the 2032 Summer...

Word Count : 238

Queensland Investment Corporation

Last Update:

2020 McKeown, Renee (18 November 2021). "QIC to Develop Brisbane's Cross River Rail Precincts". www.theurbandeveloper.com. The Urban Developer.com. Retrieved...

Word Count : 383

Chenab Rail Bridge

Last Update:

The bridge spans the Chenab River at a height of 359 m (1,178 ft) above the river, making it the world's highest rail bridge. The bridge was fully completed...

Word Count : 2451

Woolloongabba railway station

Last Update:

station is a railway station currently under construction as part of the Cross River Rail project in the Brisbane suburb of Woolloongabba. To be built as an...

Word Count : 439

Brisbane Transit Centre

Last Update:

part of the Queensland Rail City network. Roma Street busway station is served by Transport for Brisbane buses. The Cross River Rail Authority demolished...

Word Count : 475

Charing Cross railway station

Last Update:

Commission on Cross River Traffic proposed that Hungerford Bridge should be replaced by a double deck road / rail bridge, and a new Charing Cross station built...

Word Count : 3836

Merivale Bridge

Last Update:

be over capacity, leading the Queensland Government to announce the Cross River Rail project. The Merivale Bridge opened on 18 November 1978 by Premier...

Word Count : 917

Park Road railway station

Last Update:

the Dual Gauge unwired flyover, to support the final alignment of Cross River Rail southern portal. The section of track from Dutton Park Station that...

Word Count : 572

CRR

Last Update:

as the coefficient of residuals resistance Corrour railway station Cross River Rail Reserve requirement or cash reserve ratio Binomial options pricing...

Word Count : 172

Brisbane

Last Update:

1979 and 1988. The Cross River Rail project includes a twin rail tunnel (5.9 km (3.7 mi) long) which will pass under the Brisbane River to link two new railway...

Word Count : 17491

PDF Search Engine © AllGlobal.net