The Churchill Falls Generating Station is a hydroelectric underground power station in Labrador. At 5,428 MW, it is the sixteenth largest in the world, and the second-largest in Canada, after the Robert-Bourassa generating station in northwestern Quebec.
Rather than a single large dam, the plant's reservoir is contained by 88 dykes, totalling 64 km in length. The Smallwood Reservoir has a capacity of 33 cubic kilometres in a catchment area of about 72,000 square kilometres, an area larger than the Republic of Ireland. It drops over 305 metres to the site of the plant's 11 turbines.
The plant's power house was hewn from solid granite 300 metres underground. It is about 300 metres long and as high as a 15-story building.[1]
The station cost almost a billion Canadian dollars to build in 1970. Commissioned from 1971 to 1974, it is owned and operated by the Churchill Falls Labrador Corporation Limited, a joint venture between Nalcor Energy (65.8%) and Hydro-Québec (34.2%). Workers at the station live in the purpose-built company town of Churchill Falls.
The ongoing Lower Churchill Project is a joint venture between Nalcor and Emera[2] to develop the remaining 35 percent of the Churchill River basin.[3][4][5]
^"Top 10 hydroelectric dams in Canada". Canadian Mining & Energy. 27 October 2015. Retrieved 2019-07-21.
^McCarthy, Shawn (18 November 2010). "Churchill hydro deal signals era of Atlantic co-operation – The Globe and Mail". The Globe and Mail. Toronto.
^"Government of Newfoundland and Labrador Announces Sanction of the Muskrat Falls Development". Government of Newfoundland and Labrador. December 17, 2012. Retrieved Nov 29, 2020.
^"$1.5B Maritime Link approved by Emera Inc". CBC News. Dec 18, 2012. Retrieved Nov 29, 2020.
^"Maritime Link energy project approved by Nova Scotia's UARB". CBC News. Nov 29, 2013. Retrieved Nov 29, 2020.
and 22 Related for: Churchill Falls Generating Station information
Canada, the diversion of the river for the ChurchillFallsGeneratingStation has cut off almost all of the falls' former flow, leaving a small stream winding...
35 per cent of the Churchill River that was not developed by the ChurchillFallsGeneratingStation. The station at Muskrat Falls has a capacity of over...
comprising Newfoundland and Labrador Hydro, the ChurchillFallsGeneratingStation, the Lower Churchill Project, energy marketing, oil and gas development...
Canada. The company was involved in the construction of the ChurchillFallsGeneratingStation. The concept for BRINCO was conceived in 1952 by Premier of...
The Smallwood Reservoir is the reservoir created for the ChurchillFallsGeneratingStation in the western part of Labrador, Canada. Unlike other reservoirs...
needs. The province's largest power station, the 5,428-megawatt ChurchillFallsGeneratingStation, annually generates over 35 TWh of electricity that is...
will transmit generated power to a converter outside St. John's. ChurchillFallsGeneratingStation, 5428 MW Muskrat FallsGeneratingStation, 824 MW Menihek...
single-site hydroelectric power project in Canada is inaugurated at ChurchillFallsGeneratingStation. 1976 – Soweto uprising: A non-violent march by 15,000 students...
today may be ChurchillFalls, Newfoundland and Labrador, an unincorporated community home to Nalcor Energy’s ChurchillFallsGeneratingStation. Category:Company...
(714 m). ChurchillFallsGeneratingStation, Newfoundland and Labrador, Canada is the second largest underground power station in the world. It generates 5,428...
absorbed into Smallwood Reservoir upon the completion of the ChurchillFallsGeneratingStation in 1974. The lake makes up the largest part of the eastern...
Twin Fallsgeneratingstation (diverted to ChurchillFalls) Cat Arm Reservoir, Cat Arm Hydroelectric GeneratingStation Star Lake, Star Lake generating station...
River Hydroelectric Project. In Labrador, the controversial ChurchillFallsGeneratingStation was built after 20 years of negotiations, and NB Power undertook...
along a series of 735 kV transmission lines connecting to the ChurchillFallsGeneratingStation in Labrador. Power was restored to scattered rural areas within...
such projects as the Bay d'Espoir Hydroelectric Power Station, the ChurchillFallsGeneratingStation, and the Come By Chance Refinery. Lundrigan was born...
Holyrood Thermal GeneratingStation, near St. John's. The province's main power station, the 5,428-MW ChurchillFallsGeneratingStation, was commissioned...
Goreway Station, archived from the original on 2014-07-25, retrieved 2011-01-13 "Muskrat FallsGenerating Project | Nalcor Energy – Lower Churchill Project"...
Kelsey dam and hydroelectric power station, and later was expanded to include the diversion of the upper Churchill River into the Nelson River and the...