CSVT mainline highlighted in red PA 61 connector highlighted in blue
Route information
Maintained by PennDOT
Length
10.844 mi (17.452 km)
Existed
August 2022–present
History
Northern segment opened in 2022
Component highways
PA 147 from Winfield to West Chillisquaque Township
Major junctions
South end
US 15 in Union Township
Major intersections
PA 405 in Point Township
North end
PA 147 in West Chillisquaque Township
Location
Country
United States
State
Pennsylvania
Highway system
Pennsylvania State Route System
Interstate
US
State
Scenic
Legislative
The Central Susquehanna Valley Thruway (CSVT), also known as the Central Susquehanna Valley Transportation Project, is a partially-completed 10.84-mile (17.45 km) highway bypass along the U.S. Route 15 (US 15) corridor near Shamokin Dam, Pennsylvania. It has been designated as part of Corridor P-1 of the Appalachian Development Highway System by the Appalachian Regional Commission.[1] When complete, it will carry US 15 and Pennsylvania Route 147 (PA 147) over varying stretches of its length. The project includes the construction of a new bridge over the West Branch Susquehanna River and 11.7 miles (18.8 km) of new roadway, including a short freeway connection to PA 61.[2] The first phase of the project, connecting US 15 in Winfield with PA 147 near Montandon, opened in August 2022.[3]
^"Central Susquehanna Valley Transportation Project Homepage". csvt.com. Archived from the original on 23 May 2013. Retrieved 10 March 2013.
^Cite error: The named reference ItemApril3 was invoked but never defined (see the help page).
^"Governor Wolf Announces Bids Opened for Fourth CSVT Contract" (PDF). September 13, 2018. Retrieved 2020-08-03.
and 16 Related for: Central Susquehanna Valley Thruway information
downgrades to an undivided four-lane road. Recently, however, the CentralSusquehannaValleyThruway, a 10-mile (16 km) freeway project along the proposed corridor...
when PA 147 was realigned onto a new highway. As part of the CentralSusquehannaValleyThruway project, PA 405 was extended further south, replacing the...
next 10.84 miles (17.45 km) is an unbuilt freeway named the CentralSusquehannaValleyThruway (CSVT), which will partially be designated US 15 and PA 147...
was completed in 2015. As part of the construction of the CentralSusquehannaValleyThruway, PA 61 is planned to continue westward from its current northern...
and is the second-longest highway of any kind in the state, beside the Thruway. It serves 11 counties (Chautauqua, Cattaraugus, Allegany, Steuben, Chemung...
Cherry Valley massacre and Battle of Minisink, were carefully planned raids on a trail laid out "from the Susquehanna to the Delaware Valley and over...
York State Thruway (I-90) and enters exit 6, a trumpet interchange leading to exit 34A of the Thruway. A short distance after the Thruway, I-481 enters...
Jersey Turnpike (I-95) in Edison, New Jersey, clockwise to the New England Thruway (I-95) in Rye, New York, for 98.72 miles (158.87 km). Through New Jersey...
including Interstate 88 (I-88), U.S. Route 20 (US 20), and the New York State Thruway twice. The southern terminus of NY 28 is at NY 32 in Kingston and the northern...
of Hoosick in Rensselaer County. Most of the road runs along the SusquehannaValley, closely paralleling Interstate 88 (I-88) throughout that road's length...
headquarters just before it crosses over the New York State Thruway (I-87). East of the Thruway, NY 17K widens to four lanes with a middle turn lane and...
Youghiogheny River valley (both of the Ohio & Mississippi river system), • the gaps of the Allegheny connecting the Susquehanna River Valley in central Pennsylvania...
village in the town of Victor, NY 96 runs along the base of a valley separating it from the Thruway, where it intersects the eastern terminus of NY 251. The...
the Hudson Valley, the lower part of which is sometimes debated as to being upstate, the Capital District, the Mohawk Valley region, Central New York,...