Global Information Lookup Global Information

Celtic Interconnector information


Celtic Interconnector
Map
Knockraha, Ireland and La Martyre, France
Location
CountryIreland, France
Coordinates51°54′56.9″N 8°13′48.7″W / 51.915806°N 8.230194°W / 51.915806; -8.230194 (Celtic Interconnector - Ireland)
48°26′35.5″N 4°11′50.3″W / 48.443194°N 4.197306°W / 48.443194; -4.197306 (Celtic Interconnector - France)
General directionnorth-south
FromKnockraha, Ireland
Passes throughCeltic Sea
ToLa Martyre, France
Ownership information
PartnersEirGrid, RTE
Construction information
Expected2026
Technical information
Typesubmarine cable
Type of currentHVDC
Total length575 km (357 mi)
Power rating700 MW
DC voltage± 320 kV

The Celtic Interconnector is a 700 MW high-voltage direct current (HVDC) submarine power cable under construction between the southern coast of Ireland and the north-west coast of France.[1] It will be the first such interconnector between the two countries.

Trial operation is planned to commence in 2026.[2]

The director general of EirGrid stated in 2022 that the interconnector was arguably "the most important Irish infrastructure project for this decade".[3]

  1. ^ "President Hollande and An Taoiseach Kenny agree €1 billion Ireland-France Electricity Interconnector". 4coffshore.com. 21 July 2016. Retrieved 8 August 2016.
  2. ^ Cite error: The named reference PR-202310 was invoked but never defined (see the help page).
  3. ^ Cite error: The named reference RTE-20221125 was invoked but never defined (see the help page).

and 28 Related for: Celtic Interconnector information

Request time (Page generated in 0.8154 seconds.)

Celtic Interconnector

Last Update:

The Celtic Interconnector is a 700 MW high-voltage direct current (HVDC) submarine power cable under construction between the southern coast of Ireland...

Word Count : 1157

Nuclear power in Ireland

Last Update:

with the commencement of construction suggested for 2021, the Celtic Interconnector is expected to be completed by 2025. It would then become Ireland's...

Word Count : 1640

Knockraha

Last Update:

is within the Dáil constituency of Cork East. The Celtic Interconnector is a planned interconnector between the substation at Knockraha and Finistère...

Word Count : 350

Electricity sector in Ireland

Last Update:

alongside plans in the advanced stage for a higher power, planned Celtic Interconnector to France. In the 2019 UK General Election 2019, the Democratic...

Word Count : 2850

Greenlink

Last Update:

United Kingdom Moyle Interconnector, East–West Interconnector existing interconnectors across the Irish Sea Celtic Interconnector, cable project to connect...

Word Count : 524

List of HVDC projects

Last Update:

Ireland, UK Western HVDC Link East–West Interconnector: Leinster, Ireland – Shotton, Wales, UK Celtic Interconnector FAB Link IFA-2 HVDC Cross-Channel: Les...

Word Count : 5258

Energy in Ireland

Last Update:

2016, Ireland and France agreed to advance the planning of the Celtic Interconnector, which if realized will provide the two countries with a 700 MW...

Word Count : 3974

Spirit of Ireland

Last Update:

investment can be found. Additional electrical interconnector projects like the Celtic Interconnector between Ireland and France are progressing with...

Word Count : 737

NorthConnect

Last Update:

NorthConnect (also known as Scotland–Norway interconnector) was a proposed 650 km (400-mile) 1,400 MW HVDC interconnector over the floor of the North Sea. It...

Word Count : 851

Celtic Renewables

Last Update:

Celtic Renewables Ltd. is the first company to produce biofuel from the by-products of the scotch whisky industry. It has been estimated that annually...

Word Count : 366

Ireland

Last Update:

January 2011. Retrieved 30 March 2010. "Interconnection: East-West Interconnector". EirGrid. Archived from the original on 22 February 2020. Retrieved...

Word Count : 21074

Oyster wave energy converter

Last Update:

converter Pelamis Wave Energy Converter Scotland–Norway interconnector Private sector Aquamarine Power Celtic Renewables Pelamis Wave Power Wavegen Public sector...

Word Count : 1896

Isle of Man

Last Update:

national grid by a 40 MW alternating current link (Isle of Man to England Interconnector). There are also hydroelectric, natural gas and diesel generators. The...

Word Count : 13855

Findhorn Ecovillage

Last Update:

converter Pelamis Wave Energy Converter Scotland–Norway interconnector Private sector Aquamarine Power Celtic Renewables Pelamis Wave Power Wavegen Public sector...

Word Count : 2372

Scoraig

Last Update:

converter Pelamis Wave Energy Converter Scotland–Norway interconnector Private sector Aquamarine Power Celtic Renewables Pelamis Wave Power Wavegen Public sector...

Word Count : 257

Climate change in Scotland

Last Update:

converter Pelamis Wave Energy Converter Scotland–Norway interconnector Private sector Aquamarine Power Celtic Renewables Pelamis Wave Power Wavegen Public sector...

Word Count : 1855

NatureScot

Last Update:

converter Pelamis Wave Energy Converter Scotland–Norway interconnector Private sector Aquamarine Power Celtic Renewables Pelamis Wave Power Wavegen Public sector...

Word Count : 2071

Sellafield

Last Update:

Archived from the original on 29 October 2013. Retrieved 27 October 2013. "Celtic League join call to close down Sellafield". Isle of Man Today. 23 November...

Word Count : 13410

David Reay

Last Update:

converter Pelamis Wave Energy Converter Scotland–Norway interconnector Private sector Aquamarine Power Celtic Renewables Pelamis Wave Power Wavegen Public sector...

Word Count : 761

Pelamis Wave Energy Converter

Last Update:

converter Pelamis Wave Energy Converter Scotland–Norway interconnector Private sector Aquamarine Power Celtic Renewables Pelamis Wave Power Wavegen Public sector...

Word Count : 1479

Scottish Greens

Last Update:

converter Pelamis Wave Energy Converter Scotland–Norway interconnector Private sector Aquamarine Power Celtic Renewables Pelamis Wave Power Wavegen Public sector...

Word Count : 9116

Offshore wind power in the United Kingdom

Last Update:

Archived from the original on 10 May 2015. Retrieved 9 June 2015. "Centrica Celtic Array Project website". Archived from the original on 29 April 2014. Retrieved...

Word Count : 4306

Avondale Landfill

Last Update:

converter Pelamis Wave Energy Converter Scotland–Norway interconnector Private sector Aquamarine Power Celtic Renewables Pelamis Wave Power Wavegen Public sector...

Word Count : 206

Saltire Prize

Last Update:

converter Pelamis Wave Energy Converter Scotland–Norway interconnector Private sector Aquamarine Power Celtic Renewables Pelamis Wave Power Wavegen Public sector...

Word Count : 1274

Scottish Environment Protection Agency

Last Update:

converter Pelamis Wave Energy Converter Scotland–Norway interconnector Private sector Aquamarine Power Celtic Renewables Pelamis Wave Power Wavegen Public sector...

Word Count : 2792

NNFCC

Last Update:

Trade Master Agreement Gridlink Interconnector HVDC Cross-Channel Isle of Man to England Interconnector Moyle Interconnector National Grid Control Reserve...

Word Count : 286

List of offshore wind farms in the United Kingdom

Last Update:

Retrieved 2022-12-07. Memija, Adnan (2023-03-01). "Surveys Completed for Celtic Sea Floating Offshore Wind Projects". Offshore Wind. Retrieved 2023-03-02...

Word Count : 2671

2020 in the United Kingdom

Last Update:

cable between England and Denmark, set to become the world's longest interconnector upon its completion in 2023. 14 July – British mobile providers are...

Word Count : 38794

PDF Search Engine © AllGlobal.net