The Caruachi Dam is a concrete gravity dam on the Caroní River in Bolivar state, Venezuela. It supports a hydroelectric power facility with a 2,160 megawatts (2,900,000 hp) capacity. It is about 59 kilometres (37 mi) downstream from the Guri Dam belonging to the Central Hidroeléctrica Simón Bolívar, and about 35 kilometres (22 mi) from where the Caroni and Orinoco rivers meet at Ciudad Guayana.[3]
^"Dams - Caruachi". Covenpre VENCOLD. Archived from the original on 2 February 2011. Retrieved 13 January 2011.
^Cite error: The named reference P-TECH was invoked but never defined (see the help page).
^Official site of EDELCA and the Caruachi Project Archived October 16, 2007, at the Wayback Machine, published 2007, accessed 2007-11-23
The CaruachiDam is a concrete gravity dam on the Caroní River in Bolivar state, Venezuela. It supports a hydroelectric power facility with a 2,160 megawatts...
81 km (50 mi) downstream of the Guri Dam and 22 kilometres (14 mi) downstream of the CaruachiDam. The dam's main purpose is hydroelectric power generation...
Kerrada Dam Oued Kramis Dam Boukerdine Dam Bouroumi Dam Ladrat Dam Oued Isser's Dam Hamiz Dam Calueque Dam Cambambe Dam Capanda Dam Gove Dam Lauca Dam Lomaum...
Retrieved 11 March 2014. "Cahora Bassa Dam". Archived from the original on 2011-06-06. Retrieved 2010-03-01. CaruachiDam Archived 2010-03-23 at the Wayback...
the Caroní are CaruachiDam, Macagua I, Macagua II and Macagua III, with a total of 15.910 MW of installed capacity in 2003. A new dams, Tocoma (2 160...
hydroelectric power plants along the Caroní river basin. Two of them, Macagua and Caruachi, are located within city limits. The easy of access to Macagua from the...
the dam. When the generators were disconnected, the electrical frequency could not be regulated and overloaded power plants located in Caruachi and Macagua...
on the Caroní are Caruachi, Macagua I, Macagua II and Macagua III, with a total of 15.910 MW of installed capacity in 2003. New dams, Tocoma (2 160 MW)...