καλός (kalós), beautiful, and εἶδος (éidos), image
General information
Status
Under construction
Address
Paseo de la Castellana, 259-E
Town or city
Madrid
Country
Spain
Construction started
April 2017
Estimated completion
2020
Cost
240 million €
Owner
Grupo Villar Mir Megaworld Corporation
Height
Architectural
181 metres (593.8 ft)
Technical details
Floor count
36
Floor area
70,000 m2 (750,000 sq ft)
Grounds
33,325 m2 (358,710 sq ft)
Design and construction
Architecture firm
Fenwick Iribarren Serrano-Suñer Arquitectura
Developer
Obrascón Huarte Lain
Website
Official website
References
[1]
Caleido is an 181-metre (594 ft) tall, 36-story skyscraper in Madrid.[2] It is popularly known as Quinta Torre (Fifth Tower) as it stands close to the other four skyscrapers of the Cuatro Torres Business Area (CTBA) complex along the Paseo de la Castellana. As of 2021, IE University is the main tenant.[3] Its construction started in April 2017[4] and the tower was formally completed on 19 October, 2021.[5]
It occupies the former site of the Centro Internacional de Convenciones de la Ciudad de Madrid. It is the fifth tallest building in Madrid and seventh tallest in Spain.
The building was designed by architecture firms Fenwick Iribarren and Serrano-Suñer Arquitectura. The main contractor was OHL Desarrollos.[3]
^"Caleido". CTBUH Skyscraper Center.
^Serrano, Felipe (9 January 2017). "Caleido: así será la quinta torre de la Castellana". Cadena Ser (in Spanish). Retrieved 9 January 2017.
^ abDomingo, Marta R. (29 March 2016). "Así será la quinta torre que albergará el Instituto de Empresa en 2019". ABC.es (in Spanish). Retrieved 21 June 2016.
^Pareja, C. (14 May 2017). "Torre Caleido: las obras secretas del quinto rascacielos de La Castellana". EjePrime (in Spanish). Retrieved 23 May 2017.
^"Quirónsalud abre Olympia en la Torre Caleido con el foco en salud personalizada, prevención, promoción y deporte". isanidad.com (in Spanish). Retrieved 29 September 2022.
Caleido is an 181-metre (594 ft) tall, 36-story skyscraper in Madrid. It is popularly known as Quinta Torre (Fifth Tower) as it stands close to the other...
synchronization, versioning and backup service originally developed and run by Caleido Inc. It is now part of LaCie, which is in turn owned by Seagate Technology...
buildings finished in 2008. Since the site was developed a fifth tower, Caleido, was subsequently completed in 2021. Designed by Cesar Pelli and built...
Archived from the original on November 7, 2012. Retrieved 2012-04-13. "Torre Caleido". Emporis. Archived from the original on June 8, 2020. "Torre Sevilla"...
in Davao City. The Alliance Global Tower - in Uptown Bonifacio. Torre Caleido in Madrid, Spain The Petron Megaplaza in Makati CBD The World Centre Two...
tower houses roughly 6,000 students across 64 classrooms. In 2022, the Caleido Shopping Center opened below and around the tower. This shopping center...
Hard Drive the LaCie Bigger Disk. [citation needed] 2009 LaCie acquires Caleido, a Peer to peer storage start-up, with their product named Wuala. 2012...
Complexity IF Design Award, 2018, Book radiator design Marco Piva for Caleido China Awards 2018, Capital Elite award for the urban development in China...
completion. Spain Intempo apartment building in Benidorm, completed midyear. Caleido, in Madrid Sweden Sara Kulturhus in Skellefteå, designed by White Arkitekter...