Global Information Lookup Global Information

CT Fastrak information


CTfastrak
A 62-foot CTfastrak bus at Downtown New Britain station in November 2015
LocaleCentral Connecticut
Service typeBus rapid transit
Routes8 local routes
4 express routes
Stations10
Daily ridership10,046 (March 2018)[1]
Fuel typeHybrid diesel-electric[2]
OperatorConnecticut Transit
Program DirectorMichael Sanders
Websitecttransit.com/services/ctfastrak

CTfastrak (constructed as the New Britain-Hartford Busway) is a regional bus rapid transit system currently operating between downtown Hartford and Downtown New Britain station in New Britain in central Connecticut. Operated by Connecticut Transit, it is the first bus rapid transit system in Connecticut and the second in New England after the MBTA Silver Line. CTfastrak opened on March 28, 2015 after fifteen years of planning and three years of construction.[3]

CTfastrak services run on a 9.4-mile (15.1 km) dedicated busway which runs on an abandoned railroad right-of-way from Downtown New Britain to Newington Junction and alongside the active New Haven–Springfield Line from Newington Junction to downtown Hartford. Eight local and four express routes operate along the busway and over on-street loops in downtown Hartford.[4]

CTfastrak is tied with the Greater Cleveland Regional Transit Authority's HealthLine as the second-top rated BRT system in the United States each with Silver rating according to the BRT Standard.[5] Only ABQ RIDE's Albuquerque Rapid Transit has achieved the top rating of Gold.

  1. ^ "CTfastrak Ridership". Connecticut Bureau of Public Transportation. March 2018. Retrieved April 24, 2018.
  2. ^ "Greening the Community" (PDF). CTfastrak. 2014. Archived from the original (PDF) on September 11, 2015. Retrieved March 4, 2016.
  3. ^ "Despite Snow, Thousands of Riders, Many First-Timers, Experience CTfastrak on First Day of Service" (Press release). Connecticut Department of Transportation. March 28, 2015.
  4. ^ Cite error: The named reference routes was invoked but never defined (see the help page).
  5. ^ "BRT Rankings". Institute for Transportation and Development Policy. 2020. Retrieved April 26, 2020.

and 8 Related for: CT Fastrak information

Request time (Page generated in 0.765 seconds.)

CT Fastrak

Last Update:

Asylum Street in Hartford. A lengthy bridge was constructed over East Street (CT-175) and Allen Street in New Britain to eliminate former grade crossings....

Word Count : 1513

CT Transit

Last Update:

outlying suburbs and other regions of the state. In 2015, CT Transit began operation of CT Fastrak, the first bus rapid transit system in Connecticut and...

Word Count : 3823

RATP Group

Last Update:

RATP Dev manages the CT Fastrak, a bus rapid transit system in Connecticut....

Word Count : 5875

Central Naugatuck Valley

Last Update:

Retrieved November 28, 2012. "Existing and New Express Routes" (PDF). CT Fastrak. Retrieved November 29, 2012.[permanent dead link] "Metro North New Haven...

Word Count : 1122

CT Transit Hartford

Last Update:

CT Hartford is the largest division of Connecticut Transit, providing service on 43 local routes, 5 "flyer" limited stop routes and 18 express routes throughout...

Word Count : 241

Connecticut Commuter Rail Council

Last Update:

(Vacant) Metro-North Railroad Shore Line East New Haven Line Hartford Line CT Rail "Sec. 13b-212b. Metro North New Haven Rail Commuter Council established"...

Word Count : 822

List of toll roads in the United States

Last Update:

allows both FasTrak and toll-by-plate SR 125 Toll (South Bay Expressway) 10.0 16.1 SR 11 / SR 905 – Otay Mesa SR 54 – Spring Valley $2.75 (FasTrak) $3.50 (cash/credit...

Word Count : 4239

California State Route 1

Last Update:

Traffic Conditions Map California Highway Patrol Traffic Incidents Bay Area FasTrak – includes toll information on the Golden Gate Bridge and the other Bay...

Word Count : 9232

PDF Search Engine © AllGlobal.net