CRRC Qingdao Sifang CR151
| |
---|---|
![]() Exterior mockup of the CR151 | |
![]() Interior mockup of the CR151 | |
In service | 2030 |
Manufacturer | CRRC Qingdao Sifang |
Built at | Qingdao, Shandong, China |
Constructed | 2025 – 2030 |
Entered service | 2030 |
Number under construction | 264 Vehicles (44 Sets) |
Formation | 6/8 per trainset |
Depots | Changi East |
Lines served | CRL Cross Island Line |
Specifications | |
Car body construction | Welded aluminium |
Train length | 138.5 m (454 ft 4+3⁄4 in) |
Car length |
|
Width | 3.2 m (10 ft 6 in) |
Height | 3.7 m (12 ft 1+5⁄8 in) |
Doors | 10 per car, 5 per side |
Maximum speed | 90 km/h (56 mph) (service) |
Electric system(s) | 1,500 V DC Overhead conductor rail |
Current collector(s) | Pantograph |
Safety system(s) | Siemens Trainguard Sirius moving block CBTC ATC under ATO GoA 4 (UTO)[1] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
The CRRC Qingdao Sifang CR151 is a type of electric multiple unit to be built for the Cross Island Line of Singapore's Mass Rapid Transit (MRT) system. The contract was awarded to CRRC Sifang, a consortium of CRRC Qingdao Sifang Co and Singapore CRRC Sifang Railway Vehicles Service, and as of June 2023 the Land Transport Authority (LTA) has purchased 44 six-car trains. They will be delivered from 2027, before the opening of the line's first phase in 2030.[2]