Global Information Lookup Global Information

Bombardier Innovia APM 300R C801B information


Bombardier Innovia APM 300R C801B
ManufacturerCRRC Puzhen Alstom Transportation Systems (Alstom [formerly Bombardier Transportation] and CRRC Nanjing Puzhen)
Built atWuhu, Anhui, China
Family nameInnovia APM
ReplacedBombardier Innovia APM 100 C801
Constructed2019 – Current
Number built19 vehicles
FormationSingle vehicles (M) that can be coupled to form 2-car trains
Fleet numbers133 – 151
OperatorsSMRT Trains Ltd (SMRT Corporation)
DepotsTen Mile Junction
Lines served BPLRT  Bukit Panjang LRT line
Specifications
Car body constructionAluminum
Doors2 × 2 per car
Maximum speed55 km/h (34 mph) (design)
48 km/h (30 mph) (service)
Traction systemAlstom MITrac (500 series) IGBT–VVVF
Electric system(s)600 V 50 Hz 3-phase AC third rail
Current collector(s)Collector shoe
AAR wheel arrangementA-A
Safety system(s)Alstom Cityflo 650 moving block CBTC ATC under ATO GoA 4 (UTO), with subsystems of ATP, ATS and CBI
Coupling systemDellner
Track gauge2,642-millimetre (8 ft 8 in) central guideway with rubber tyres

The Bombardier Innovia APM 300R C801B (APM 300R) is the third generation of automated people mover (APM) trains built by CRRC Puzhen Alstom Transportation Systems (joint venture of Alstom [formerly Bombardier Transportation] and CRRC Nanjing Puzhen) for the Bukit Panjang LRT line, to replace the existing C801 trains built in 1999.[1][better source needed] The C801B trains are also the first of its kind to reuse the retro AC third rail shoes compared to the newer Light Rail lines around the world that utilises the APM 300 system that have been built with DC third rail instead of AC.

  1. ^ "Bombardier Wins Contract to Upgrade Singapore's Bukit Panjang Light Rail Transit Line - Bombardier". www.bombardier.com. Archived from the original on 8 April 2019. Retrieved 23 October 2019.

and 4 Related for: Bombardier Innovia APM 300R C801B information

Request time (Page generated in 0.8992 seconds.)

Bombardier Innovia APM 300R C801B

Last Update:

The Bombardier Innovia APM 300R C801B (APM 300R) is the third generation of automated people mover (APM) trains built by CRRC Puzhen Alstom Transportation...

Word Count : 660

Bombardier Innovia APM 100 C801

Last Update:

C801 trains would be withdrawn from service, and replaced by Bombardier Innovia APM 300R C801B automated people mover cars. On 26 November 2023, the first...

Word Count : 898

Tampa International Airport

Last Update:

(APM) system which employs 16 Bombardier Innovia APM 100 Shuttle Cars, which are in the process of being replaced to Bombardier Innovia APM 300R C801B...

Word Count : 4373

Bukit Panjang LRT line

Last Update:

train runs near residential buildings. 19 Bombardier Innovia APM 300R trains have been procured under C801B as part of the Bukit Panjang LRT overhaul...

Word Count : 2637

PDF Search Engine © AllGlobal.net