Official nameComplexo Hidrelétrico Belo Monte
LocationPará, Brazil
Coordinates3°7′40″S 51°46′33″W / 3.12778°S 51.77583°W / -3.12778; -51.77583
StatusOperational
Construction began2011
Opening date2016
Construction costUS$18.5 billion (estimated)
Owner(s)Norte Energia, S.A.
Operator(s)Eletronorte
Dam and spillways
Type of damComposite
ImpoundsXingu River
HeightBelo Monte: 90 m (295 ft)
Pimental: 36 m (118 ft)
Bela Vista: 33 m (108 ft)[1]
LengthBelo Monte: 3,545 m (11,631 ft)
Pimental: 6,248 m (20,499 ft)
Bela Vista: 351 m (1,152 ft)[1]
Dam volumeBelo Monte and embankments: 25,356,000 m3 (895,438,689 cu ft)
Pimental: 4,768,000 m3 (168,380,331 cu ft)
Bela Vista: 239,500 m3 (8,457,863 cu ft)[1]
Spillways2 (Pimental and Bela Vista Dams)
Spillway typePimental: 17 gates
Bela Vista: 4 gates
Spillway capacityPimental: 47,400 m3/s (1,673,915 cu ft/s)
Bela Vista: 14,600 m3/s (515,594 cu ft/s)[1]
Reservoir
CreatesDos Canais Reservoir (Belo Monte, Bela Vista Dam)
Calha Do Xingu Reservoir (Pimental Dam)
Total capacityDos Canais: 1,889,000,000 m3 (1,531,437 acre⋅ft)
Calha Do Xingu: 2,069,000,000 m3 (1,677,366 acre⋅ft)[1]
Catchment area447.719 km2 (173 sq mi)
Surface areaDos Canais: 108 km2 (42 sq mi)
Calha Do Xingu: 333 km2 (129 sq mi)[1]
Maximum water depth6.2–23.4 m (20.3–76.8 ft)
Power Station
Operator(s)Eletronorte
Commission dateNovember 2019
Hydraulic headBelo Monte: 89.3 m (293 ft)
Pimental: 13.1 m (43 ft)[1]
TurbinesBelo Monte: 18 x 611.11 MW Francis turbines
Pimental: 6 x 38.85 MW Kaplan bulb turbines
Installed capacity11,233 MW[2]
Annual generation39.5 TWh[3]
Infographic about the costs of the Belo Monte Dam

The Belo Monte Dam (formerly known as Kararaô) is a hydroelectric dam complex on the northern part of the Xingu River in the state of Pará, Brazil. After its completion, with the installation of its 18th turbine, in November 2019, the installed capacity of the dam complex is 11,233 megawatts (MW), which makes it the second largest hydroelectric dam complex in Brazil and the fifth largest in the world by installed capacity, behind the Three Gorges Dam, Baihetan Dam and the Xiluodu Dam in China and the Brazilian-Paraguayan Itaipu Dam. Considering the oscillations of river flow, guaranteed minimum capacity generation from the Belo Monte Dam would measure 4,571 MW, 39% of its maximum capacity.[4]

Brazil's rapid economic growth over the last decade has provoked a huge demand for new and stable sources of energy, especially to supply its growing industries. In Brazil, hydroelectric power plants produce over 66% of the electrical energy.[5] The Government has decided to construct new hydroelectric dams to guarantee national energy security. However, there was opposition both within Brazil and among the international community to the project's potential construction regarding its economic viability, the generation efficiency of the dams and in particular its impacts on the region's people and environment. In addition, critics worry that construction of the Belo Monte Dam could make the construction of other dams upstream- which could have greater impacts- more viable.

Plans for the dam began in 1975 but were soon shelved due to controversy; they were later revitalized in the late 1990s. In the 2000s, the dam was redesigned, but faced renewed controversy and controversial impact assessments were carried out. On 26 August 2010, a contract was signed with Norte Energia to construct the dam once the Brazilian Institute of Environment and Renewable Natural Resources (IBAMA) had issued an installation license. A partial installation license was granted on 26 January 2011 and a full license to construct the dam was issued on 1 June 2011. The licensing process and the dam's construction have been mired in federal court battles; the current ruling is that construction is allowed, because the license is based on five different environmental technical reports[6] and in accordance with the RIMA (Environmental Impact Report, EIA-RIMA) study for Belo Monte.[7]

The first turbines went online on 5 May 2016.[8] As of October 2019 all turbines at Pimental and 17 turbines in main power powerhouse are online with total installed capacity of 10,388.87 MW at Belo Monte site, totaling 10,621.97 with the Pimental site.[9] The power station was completed in November 2019.[10]

  1. ^ a b c d e f g Cite error: The named reference techspecs was invoked but never defined (see the help page).
  2. ^ "A história de Belo Monte – Cronologia". Norte Energia (in Brazilian Portuguese). Archived from the original on 4 April 2019. Retrieved 5 February 2022.
  3. ^ Empresa de Pesquisa Energética (2010), Consumo nacional de energia elétrica cresce 8,4% em dezembro Archived 3 February 2016 at the Wayback Machine. Resenha Mensal do Mercado de Energia Elétrica (In Portuguese), Ano III, no. 28, Janeiro de 2010. Acessada em 2011-12-01.
  4. ^ "Contrato de concessão №01/2010-mme-UHE Belo Monte" [Concession Contract № 01/2010 Belo Monte Dam] (PDF) (in Portuguese). ANEEL. 2010. Archived (PDF) from the original on 6 July 2011. Retrieved 7 March 2011.
  5. ^ "Hydropower made up 66% of Brazil's electricity generation in 2020". www.eia.gov. Retrieved 15 November 2023.
  6. ^ VIEIRA, Isabel (2011). "Diretora do Ibama diz que licença para Belo Monte teve por base cinco pareceres técnicos" Archived 31 December 2012 at archive.today|language= Portuguese. Agência Brasil, 31 January 2011
  7. ^ RIMA (2009). "Relatório de Impacto Ambiental do Aproveitamento Hidrelétrico Belo Monte" Archived 3 March 2016 at the Wayback Machine. Eletrobrás. May/2009.
  8. ^ "Dilma inaugura usina hidrelétrica de Belo Monte — Portal Brasil". Archived from the original on 16 July 2016. Retrieved 29 July 2016.
  9. ^ "A história de Belo Monte – Cronologia". Norte Energia (in Brazilian Portuguese). Archived from the original on 4 April 2019. Retrieved 16 May 2019.
  10. ^ "Brazil unveils world's fourth biggest hydropower plant". Agência Brasil. 28 November 2019. Retrieved 25 April 2020.

and 20 Related for: Belo Monte Dam information

Request time (Page generated in 0.8733 seconds.)

Belo Monte Dam

Last Update:

The Belo Monte Dam (formerly known as Kararaô) is a hydroelectric dam complex on the northern part of the Xingu River in the state of Pará, Brazil. After...

Word Count : 8997

Raoni Metuktire

Last Update:

In February 1989, Raoni became one of the fiercest opponents to the Belo Monte Dam project. Television broadcasts transmitted his opinions in Altamira...

Word Count : 1919

Xingu River

Last Update:

is building the Belo Monte Dam, which will be the world's third-largest hydroelectric dam, on the Lower Xingu. Construction of this dam is under legal...

Word Count : 996

David Mayer de Rothschild

Last Update:

better understanding and publicizing the effects of the controversial Belo Monte dam project. This expedition was supplemented by articles on Myoo.com and...

Word Count : 2252

Kayapo

Last Update:

proposed a series of hydroelectric dams to be built in the Xingu River area, namely the Belo Monte Dam. These dams were an imminent threat to the Kayapo...

Word Count : 2507

Hydroelectricity

Last Update:

ecosystems, and siltation and erosion patterns. While dams can ameliorate the risks of flooding, dam failure can be catastrophic. In 2021, global installed...

Word Count : 5416

Alexander Soros

Last Update:

her inspiring role leading campaigns to stop the construction of the Belo Monte Dam and other infrastructure projects in the Amazon rainforest. Alex is...

Word Count : 1067

Dilma Rousseff

Last Update:

Stop the Belo Monte Monster Dam! Archived 3 May 2012 at the Wayback Machine Amazon Watch official site. Retrieved 10 May 2012. Belo Monte Dam: A spearhead...

Word Count : 14972

Rainforest Foundation Fund

Last Update:

countries. They mention as an illustration the controversy surrounding the Belo Monte Dam in Brazil: "While at the United Nations discussions are underway on...

Word Count : 1955

Operation Car Wash

Last Update:

stadiums for the 2014 World Cup, the Angra 3 nuclear power plant, the Belo Monte dam, and the North-South and Fiol railways. Prosecutors also tracked overseas...

Word Count : 9894

Allobates crombiei

Last Update:

intermittent freshwater marshes. It is threatened by habitat loss and the Belo Monte Dam. It is named in honor of Ronald Ian Crombie. IUCN SSC Amphibian Specialist...

Word Count : 100

Zebra pleco

Last Update:

certain fish species, including H. zebra. H. zebra is threatened by the Belo Monte Dam in the Xingu river which has caused a severe reduction of the water...

Word Count : 845

List of largest hydroelectric power stations

Last Update:

Energy.people.com.cn. 2014-07-02. Retrieved 2017-02-22. "A história de Belo Monte – Cronologia". Norte Energia (in Brazilian Portuguese). Retrieved 2019-10-11...

Word Count : 1376

List of conventional hydroelectric power stations

Last Update:

Three Gorges Dam are the Baihetan Dam, Itaipu Dam, Xiluodu Dam, Belo Monte Dam, Guri Dam, Wudongde Dam and the Tucurui Dam, rated at 16,000 MW, 14,000 MW...

Word Count : 4598

Peacock bass

Last Update:

the lower Xingu River in an area that will be heavily affected by the Belo Monte Dam. Sport fishermen have made these cichlids prized game fish for their...

Word Count : 2711

List of largest power stations

Last Update:

Belo Monte – Cronologia". Norte Energia (in Brazilian Portuguese). Archived from the original on 4 April 2019. Retrieved 11 October 2019. "UHE Belo Monte...

Word Count : 5731

South America

Last Update:

each. North Region has large hydroelectric plants, such as Belo Monte Dam and Tucuruí Dam, which produce much of the national energy. Brazil's hydroelectric...

Word Count : 19064

Brazilian Development Bank

Last Update:

BNDES approved a 22.5 billion real loan for the construction of the Belo Monte Dam, a project that displaced local communities. The plan was strongly criticized...

Word Count : 866

List of environmental conflicts

Last Update:

Zarca dam Belo Monte dam Bhakra Dam Bujagali Hydroelectric Power Station Chico River dam Flint water crisis Hatgyi Dam Rasi Salai Dam Sardar Sarovar Dam Save...

Word Count : 747

Brazilian Institute of Environment and Renewable Natural Resources

Last Update:

wilderness disappeared in 2000 and the species became extinct in the wild. Belo Monte Dam Environmentalism in Rio Grande do Sul "Ibama (Instituto Brasileiro do...

Word Count : 872

PDF Search Engine © AllGlobal.net