The Beauharnois generating station is a run-of-the-river hydroelectric power station along the Saint Lawrence Seaway on the Saint Lawrence River, in Quebec, Canada. The station was built in three phases,[1] and comprises 36 turbines, capable of generating up to 1,903 MW of electrical power. Constructions on the facility began in 1930 and was completed in 1961.[2]
The facility was designated a National Historic Site of Canada in 1990.[3]
^"Beauharnois Power Plant". SPG Hydro International: Projects. Archived from the original on 2012-03-23. Retrieved 2019-05-21.
^Hydroelectric generating stations of HydroQuebec, retrieved 2010-06-25
^"Beauharnois Power Development National Historic Site of Canada". Directory of Designations of National Historic Significance of Canada. Parks Canada. Retrieved 5 March 2012.
and 19 Related for: Beauharnois generating station information
The Beauharnoisgeneratingstation is a run-of-the-river hydroelectric power station along the Saint Lawrence Seaway on the Saint Lawrence River, in Quebec...
214 terawatt-hours (TWh), 95% of which comes from hydroelectric power stations, and 4.7% of which come from wind energy. The public company Hydro-Québec...
tunnel connecting Beauharnois and Melocheville in Quebec, Canada. It is a segment of Route 132 located near the Beauharnoisgeneratingstation. The tunnel measures...
a political scandal surrounded the construction of the Beauharnois Hydroelectric Power Station, on the Saint Lawrence River, west of Montreal. Critics...
The Beauharnois scandal was a Canadian political scandal around 1930. The Beauharnois Light, Heat and Power Company had given $700,000 to the ruling Liberal...
generating facility is the Bruce Nuclear GeneratingStation in Ontario and has an installed capacity of 6,610 MW. List of the electrical generating facilities...
229–230. Boyko, John (July 27, 2020). "Charles de Beauharnois de La Boische, Marquis de Beauharnois". The Canadian Encyclopedia. Retrieved May 25, 2021...
Drummondville GeneratingStation Water-resource system St-Lawrence river Beauharnois Hydroelectric GeneratingStation Des Cèdres GeneratingStation Water-resource...
4 cents per kilowatt-hour, attributed to the nearby Beauharnois Hydroelectric GeneratingStation. The greenhouse, when completed, will be over twice the...
and the third phase of the Beauharnoisgeneratingstations to keep up. After commissioning the Beaumont generatingstation in 1958, the Shawinigan Water...
Generating Facility, archived from the original on 2013-01-01, retrieved 2010-08-24 Hydro-Québec Production (2014), Hydroelectric GeneratingStations...
International: Beauharnois Hydroelectric Power Station, archived from the original on 2012-03-23, retrieved 2010-06-25 Hydroelectric power stations of Hydro-Québec...
Historic Places. http://www.hydroquebec.com/learning/histoire/pop_centrale_beauharnois.html [permanent dead link] Chambly Canal. Canadian Register of Historic...
Holyrood Thermal GeneratingStation, near St. John's. The province's main power station, the 5,428-MW Churchill Falls GeneratingStation, was commissioned...
through the towns of Les Cèdres and Coteau-du-Lac. It superseded the first Beauharnois Canal which was on the south shore of the Saint Lawrence. It is 23 kilometres...
sometimes wore a variety of quasi-military uniforms. Two companies from Beauharnois were heavily engaged at the Battle of Châteauguay. In Upper Canada, several...
Shackleton on 19 June 1956. The Royal Fleet Auxiliary (RFA) supply ship Fort Beauharnois followed on 23 June, and became a temporary headquarters ship. It was...
com lays the first brick of its future North American data centre in Beauharnois". CNW A PR Newswire Company. CNW Group Ltd. 26 January 2012. Retrieved...