This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages)
An editor has performed a search and found that sufficient sources exist to establish the subject's notability. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "BR Standard Class 6 72010 Hengist" – news · newspapers · books · scholar · JSTOR(August 2020) (Learn how and when to remove this message)
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "BR Standard Class 6 72010 Hengist" – news · newspapers · books · scholar · JSTOR(August 2020) (Learn how and when to remove this message)
(Learn how and when to remove this message)
BR 72010 Hengist
Frames being assembled in Sheffield in May 2019
Type and origin
Power type
Steam
Builder
The Clan Project
Specifications
Configuration:
• Whyte
4-6-2
• UIC
2′C1′ h2
Gauge
4 ft 8+1⁄2 in (1,435 mm) standard gauge
Leading dia.
3 ft 4 in (1,016 mm)
Driver dia.
6 ft 2 in (1,880 mm)
Trailing dia.
3 ft 3+1⁄2 in (1,003 mm)
Career
Class
Standard Class 6
Number in class
11
Numbers
72010
Official name
Hengist
Disposition
Under Construction
No.72010 Hengist is a steam locomotive which is under construction as a "new-build" project. The design is based on the mixed traffic BR Standard 6 Clan Class, none of which were preserved.[1] The project is akin to the construction of the 60163 Tornado.
The project maintains a build diary, showing monthly progress of the build which has been ongoing since 2010.[2]
^Devereux (2019).
^Clan Project (2020b).
and 6 Related for: BR Standard Class 6 72010 Hengist information
No.72010Hengist is a steam locomotive which is under construction as a "new-build" project. The design is based on the mixed traffic BRStandard6 Clan...
co-ordination. The new build of the 'Clan' class72010 “Hengist” is progressing steadily. The new build of the Class 3 Tank 82045 is well underway, work continues...
2-6-2T 82045 project. BRStandardClass6 4-6-2 72010Hengist project. Newbuild member of class of the original unbuilt class-members of the second batch...