The Aberystwith and Welsh Coast Railway was a standard gauge railway company, running a line along the west coast of Wales.
The railway was planned to run between Aberystwyth[note 1] and Pwllheli, and on to Porth Dinllaen, with branches to Dolgelly and Machynlleth. These branches joined the Bala and Dolgelly Railway and Newtown and Machynlleth Railway respectively. There were two major river bridges planned: the Dovey Bridge, across the River Dovey, and the Barmouth Bridge, over the River Mawddach. The former proved impracticable to build, so an altered route was built from Aberdovey to Dovey Junction, near Glandyfi, forming a Y-shaped network. Parliamentary powers were also obtained on multiple occasions for a line from Pwllheli to Porth Dinllaen, though this was never built. The routes were opened progressively between 1863 and 1869.
The company was absorbed into Cambrian Railways in 1865. Continuous shortages of money delayed the completion of the network.
The Dolgelly branch was closed in 1965 as part of the Beeching cuts, and the remainder of the line was under threat of closure in the 1970s. In 1980, serious defects were found in Barmouth Bridge due to a marine worm boring into timber piles, which took several years to fix.
Cite error: There are <ref group=note> tags on this page, but the references will not show without a {{reflist|group=note}} template (see the help page).
and 29 Related for: Aberystwith and Welsh Coast Railway information
Shrewsbury) and of the narrow-gauge Vale of Rheidol Railway. The original station was built in 1864 by the AberystwithandWelshCoastRailway for the route...
Gwynedd, Wales, on the Cambrian Coast line between Machynlleth and Pwllheli. Built by the AberystwithandWelshCoastRailway in 1865, it was formerly the...
companies became the shareholders in the new Cambrian Railways Company. The AberystwithandWelshCoastRailway was not included in the amalgamation because it...
The Welsh Highland Railway (WHR; Welsh: Rheilffordd Eryri) is a 25-mile (40.2 km) long, restored 1 ft 11+1⁄2 in (597 mm) narrow gauge heritage railway in...
Coast Railway. In 1861 the AberystwithandWelshCoastRailway was given authorisation to build a line along Cardigan Bay between Aberystwyth and Porthdinllaen...
designed by and constructed for the AberystwithandWelshCoastRailway on its line between Aberystwyth and Pwllheli. Work was authorised in 1861 and commenced...
Newtown and Machynlleth Railway between Moat Lane Junction and Machynlleth AberystwithandWelshCoastRailway between Machynlleth and Aberystwyth/Pwllheli...
a railway station in Afon Wen, Gwynedd, Wales, four miles (6 km) west of Criccieth. The station formed a junction between the AberystwithandWelsh Coast...
The Fairbourne Railway (Welsh: Rheilffordd y Friog) is a 12+1⁄4 in (311 mm) gauge miniature railway running for 2 miles (3.2 km) from the village of Fairbourne...
Machynlleth and Shrewsbury. The line was built by the AberystwithandWelshCoastRailway in 1863 and became incorporated in the Cambrian Railways in 1867...
Rheidol Railway (Welsh: Rheilffordd Cwm Rheidol) is a 1 ft 11+3⁄4 in (603 mm) narrow gauge heritage railway in Ceredigion, Wales, between Aberystwyth and Devil's...
The Ffestiniog Railway (Welsh: Rheilffordd Ffestiniog) is a heritage railway based on 1 ft 11+1⁄2 in (597 mm) narrow-gauge, located in Gwynedd, Wales...
Welshpool and Llanfair Light Railway (W&LLR) (Welsh: Rheilffordd y Trallwng a Llanfair Caereinion) is a 2 ft 6 in (762 mm) narrow gauge heritage railway in Powys...
standard gauge Newtown and Machynlleth Railway had opened, followed on 1 July of the same year by the AberystwithandWelshCoastRailway's (A&WCR) line from...
(45 km) of track from Bangor to Porthdinllaen 1860 – The AberystwithandWelshCoastRailway Company wanted to construct a line from Aberystwyth to Porthdinllaen...
Wikimedia Commons Train times and station information for Talsarnau railway station from National Rail RAILSCOT on AberystwithandWelshCoastRailway v t e...
railway station at Wikimedia Commons Train times and station information for Harlech railway station from National Rail RAILSCOT on Aberystwithand Welsh...
opened by the AberystwithandWelshCoastRailway as Portmadoc on 12 September 1867, and renamed Porthmadog on 5 May 1975. The Festiniog Railway's Porthmadog...
The Heart of Wales line (Welsh: Llinell Calon Cymru) is a railway line running from Craven Arms in Shropshire to Llanelli in southwest Wales. It serves...
September 1867 by the AberystwithandWelshCoastRailway. Goods services were withdrawn in 1964. The line between Caernarvon and Afonwen was closed the...
built by the AberystwithandWelshCoastRailway (A&WCR) on 22 July 1861. During construction, the A&WCR amalgamated with the Cambrian Railways, this being...
The Swansea and Mumbles Railway was the venue for the world's first passenger horsecar railway service, located in Swansea, Wales, United Kingdom. Originally...
Tygwyn railway station at Wikimedia Commons Train times and station information for Tygwyn railway station from National Rail RAILSCOT on Aberystwithand Welsh...